|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 5/1/2024 Measured TD: 1606 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 5/1/2024 | Wellbore Permit | | Permit #: | 010152 | Expiration Date: | 1/25/2002 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 3/19/2001 | Spud Date: | 2/14/2001 | Spud Date Is: | ACTUAL | Measured TD: | 1606 ft. | Measured PB depth: | 1603 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP. DENSITY/NEUTRON,SINGLE INDUCTION & CEMENT BOND | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 55, Top: 0 ft., Bottom: 212 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1530 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 207, Top: 0 ft., Bottom: 1530 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1075 ft. | N | N | VERMEJO COAL | 1075 ft. | 1456 ft. | N | N | TRINIDAD | 1456 ft. | 1584 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 5/1/2024 Interval Top: 1146 ft. Interval Bottom: 1351 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 4/14/2001 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/19/2001 | Treatment Summary: | PERFORATIONS: 1337'-39', 1343'-46', 1348'-51' (4 SPF) FRAC 1ST STAGE W/ 12,169 GAL. 20# DELTA FRAC 140 (INC. PAD), 24,860# 16/30 & 250 GAL ACID. PERFORATIONS: 1181'-90', 1202'-05' (4 SPF) FRAC 2ND STAGE W/ 13,744 GAL. 20# DELTA FRAC 140 (INC. PAD), 17,580# 16/30. NO ACID PERFORATIONS: 1168'-72' (4 SPF) FRAC 3RD STAGE W/ 10,186 GAL. 20# DELTA FRAC 140 (INC. PAD), 17,510# 16/30. NO ACID. PERFORATIONS: 1146'-54' (4 SPF) FRAC STAGE W/ 15,166 GAL. 20# DELTA FRAC 140 (INC. PAD), 29,550# 16/30. NO ACID. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1371 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/14/2001 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 216 | BBLS_OIL | 0 | BTU_GAS | 984 | CALC_BBLS_H2O | 216 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 2 | CASING_PRESS | 25 | MCF_GAS | 2 |
| Perforation Data: | Interval Top: | 1146 ft. | # Of Holes: | 128 | Interval Bottom: | 1351 ft. | Hole Size: | 4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 7935 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 3.740 |
Average MCFE per Day | 21.713 |
Federal Financial Assurance | i | |
|
|