|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 2/22/2001 Measured TD: 2490 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 2/22/2001 | Wellbore Permit | | Permit #: | 20001458 | Expiration Date: | 12/14/2001 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 2/10/2001 | Spud Date: | 1/10/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2490 ft. | Measured PB depth: | 2469 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | INDUCTION, DENSITY & CEMENT BOND LOGS | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 434 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 103, Top: 0 ft., Bottom: 434 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2463 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 1676 ft., Bottom: 2463 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1610 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 245, Top: 0 ft., Bottom: 1676 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 2114 ft. | N | N | VERMEJO COAL | 2114 ft. | 2416 ft. | N | N | TRINIDAD | 2416 ft. | 2490 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 2/22/2001 Interval Top: 2123 ft. Interval Bottom: 2373 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 2/22/2001 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/10/2001 | Treatment Summary: | PERFORATIONS: 2368'-73' (4 SPF) FRAC 1ST STAGE W/ 20,750 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 40,000# 16/30, 250 GAL 15% HCL PERFORATIONS: 2338'-42' (4 SPF) FRAC 2ND STAGE W/ 17,050 GAL. 24# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 30,000# 16/30, 250 GAL. 15% HCL. PERFORATIONS: 2309'-13', 2322'-26; (4 SPF) FRAC 3RD STAGE W/ 35,350 GAL. 24# DELTA FRAC 140 (INC. PAD), 2,000 GAL. LINEAR GEL, 80,000# 16/30, 250 GAL. 15% HCL. PERFORATIONS: 2293'-97' (4 SPF) FRAC 4RD STAGE W/ 24,550 GAL. 24# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 50,000# 16/30, 250 GAL. 15% HCL. PERFORATIONS: 2198'-2204' (4 SPF) FRAC 5TH STAGE W/ 20,750 GAL. 24# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 40,000# 16/30, 250 GAL. 15% HCL. PERFORATIONS: 2123'-27,2133'-37' (4 SPF) FRAC 6TH STAGE W/ 20,750 GAL. 24# DELTA FRAC 140 ( INC. PAD), 2,500 GAL. LINEAR GEL, 40,000# 16/30, 250 GAL. 15% HCL. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2383 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/22/2001 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 310 | BBLS_OIL | 0 | BTU_GAS | 984 | CALC_BBLS_H2O | 310 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 6 | CASING_PRESS | 25 | MCF_GAS | 6 |
| Perforation Data: | Interval Top: | 2123 ft. | # Of Holes: | 140 | Interval Bottom: | 2373 ft. | Hole Size: | 4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 7705 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 3.637 |
Average MCFE per Day | 21.104 |
Federal Financial Assurance | i | |
|
|