Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07146
Well Classification: CBM Status: PR - 8/31/2010
Well Name/No:HILL RANCH #10-02V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/31/2010
FacilityID:258759LocationID:307877
County:LAS ANIMAS #071Location:NWNE 10 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8029 ft.
Planned Location:1316FNL  1950 FELLat/Long: 37.015395 / -104.872668Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.015360 / -104.872640Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/31/2010             Measured TD: 2390 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/31/2010
Wellbore Permit
Permit #:20001456 Expiration Date:12/14/2001
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/12/2001
Spud Date:1/20/2001Spud Date Is:ACTUAL
Measured TD:2390 ft.Measured PB depth:2278 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DENSITY/NEUTRON,SINGLE IND.& CMT BOND (2)
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: 214 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2372 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 355, Top: 796 ft., Bottom: 2372 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 584 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2016 ft.NN
VERMEJO COAL2016 ft.2300 ft.NN
TRINIDAD2300 ft.2390 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/30/2005                 Interval Top: 2032 ft.    Interval Bottom: 2279 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:5/20/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:4/30/2005
Treatment Summary:ACIDIZED W/ 1000 GALS 15% HCL ACID FRAC'D W/ 106,464 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 58,000# 15/30 & 37,500# 12/20 BRADY SAND.
Formation Treatment
Treatment Date:4/12/2001
Treatment Summary:PERFORATIONS: 2276'-80' (4 SPF) FRAC 1ST STAGE W/ 12,805 GAL. FRAC (INC PAD) 33,600# 16/30, 205,130 SCF N2, 250 GAL 15% HCL PERFORATIONS: 2220'-24' (4 SPF) FRAC 2ND STAGE W/ 12,286 GAL. FRAC (INC. PAD) 32,800# 16/30, 185,000 SCF N2, NO ACID. PERFORATIONS: 2196'-99' (4 SPF) FRAC 3RD STAGE W/ 6,357 GAL. FRAC (INC. PAD) 16,500# 16/30, 96,302 SCF N2, NO ACID. PERFORATIONS: 2130'-33', 2136'-38, 2145'-47' (4 SPF) FRAC 4RD STAGE W/ 13,957 GAL. FRAC (INC. PAD) 33,500# 16/30, 198,298 SCF N2, NO ACID. PERFORATIONS: 2039'-42', 2047'-49' (4 SPF) FRAC 5TH STAGE W/ 9,472 GAL. FRAC (INC. PAD) 25,500# 16/30, 135,965 SCF N2, NO ACID
Tubing Size:2.875 in.Tubing Setting Depth:2091 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2005Test Method:
Hours Tested:4Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 139
BBLS_OIL 0
CALC_BBLS_H2O 834
CALC_BBLS_OIL 0
CALC_MCF_GAS 72
CASING_PRESS 65
MCF_GAS 12
TUBING_PRESS 8
Perforation Data:
Interval Top:2032 ft.# Of Holes:24
Interval Bottom:2279 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/31/2010                 Interval Top: 429 ft.    Interval Bottom: 2280 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/27/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2324 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BTU_GAS 1001
CALC_BBLS_H2O 10
CALC_MCF_GAS 85
CASING_PRESS 2
MCF_GAS 85
TUBING_PRESS 2
Perforation Data:
Interval Top:429 ft.# Of Holes:250
Interval Bottom:2280 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 429 ft.    Interval Bottom: 1887 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/27/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/3/2010
Treatment Summary:Acidized w/5,000 gals 15% HCl acid. Frac'd w/231,394 gals 20# Delta 140 carrying 38,280# 16/30 Brady sd & 421,300# 12/20 Brady sd (222,300# 12/20 Brady sd coated w/Expedite 155).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:429 ft.# Of Holes:122
Interval Bottom:1887 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)34839
GOR
GOR DeterminationMCFE
Average BOE per Day16.451
Average MCFE per Day95.411

 Federal Financial Assurance  i 

 Tribal Well  i No