|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 1/24/2007 Measured TD: 2461 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 1/24/2007 | Wellbore Permit | | Permit #: | 20001452 | Expiration Date: | 12/13/2001 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 2/13/2001 | Spud Date: | 1/6/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2461 ft. | Measured PB depth: | 2429 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | INDUCTION, DENSITY, NEUTRON & CBL (CASED HOLE) | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 50, Top: 0 ft., Bottom: 212 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2452 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 535, Top: 1510 ft., Bottom: 2452 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: 220, Top: 40 ft., Bottom: 1510 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 2064 ft. | N | N | VERMEJO COAL | 2064 ft. | 2372 ft. | N | N | TRINIDAD | 2372 ft. | 2460 ft. | N | N |
Formation RTON Formation Classification: GW Status: CM - 1/25/2007 Interval Top: 2128 ft. Interval Bottom: 2341 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 1/24/2007 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/12/2007 | Treatment Summary: | SET RBP @ 2365' PKR @ 2276' PPD 300 GALS 15% HCI AC W/ 1 5% FE AC SWN TBG DISPL AC W/ 25 BPW RLS RBP SET RBP 2275' PKR 2241' PPD 275 GALS 15% HCL AC W/ 1 5% FE AC DWN TBG DISPL W/25 BPW RLS PKR. RBP SET RBP 2241' PKR 2151' PPD 275 GALS 15% HCI AC W/1 5% FE AC DWN TBG DISPL AC W/25 BPW RLS PKR. RBP SET RBP 2151', PKR 2091' PPD 175 GAL 15% HCI AC W/ 1 5% HCI AC DWN TBG DISPL AC W/ 25 BPW RLS PKR. RBP TOH W/ TBG. PKR RBP |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2387 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/25/2007 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 67 | BTU_GAS | 1006 | CALC_BBLS_H2O | 67 | CALC_MCF_GAS | 100 | CASING_PRESS | 2 | GRAVITY_OIL | 0.562 | MCF_GAS | 100 | TUBING_PRESS | 5 |
| Perforation Data: | Interval Top: | 2128 ft. | # Of Holes: | 136 | Interval Bottom: | 2341 ft. | Hole Size: | 0.45 in. |
|
Formation VRMJ Formation Classification: GW Status: CM - 2/24/2001 Interval Top: 2128 ft. Interval Bottom: 2341 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 2/24/2001 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/13/2001 | Treatment Summary: | PERFORATIONS: 2332'-35, 2338'-41' (4 SPF) FRAC 1ST STAGE W/ 20,750 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 40,000# 16/30, 250 GAL 15% HCL PERFORATIONS: 2286'-90' (4 SPF) FRAC 2ND STAGE W/ 20,750 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 40,000# 16/30, 250 GAL. 15% HCL. PERFORATIONS: 2254'-58', 2260'-64' (4 SPF) FRAC 3RD STAGE W/ 28,050 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 60,000# 16/30, 250 GAL. 15% HCL PERFORATIONS: 2203'-07', 2216'-20' (4 SPF) FRAC 4RD STAGE W/ 31,950 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 70,000# 16/30, 250 GAL. 15% HCL PERFORATIONS: 2128'-32' (4 SPF) FRAC 4TH STAGE W/ 17,050 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 30,000# 16/30, 250 GAL. 15% HCL |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2358 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/24/2001 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 150 | BBLS_OIL | 0 | BTU_GAS | 984 | CALC_BBLS_H2O | 150 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 10 | CASING_PRESS | 25 | MCF_GAS | 10 |
| Perforation Data: | Interval Top: | 2128 ft. | # Of Holes: | 124 | Interval Bottom: | 2341 ft. | Hole Size: | 4 in. |
|
Formation RT-VJ Formation Classification: Status: PR - 1/24/2007 Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 1/24/2007 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RT-VJ. |
| No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 10894 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 5.147 |
Average MCFE per Day | 29.838 |
Federal Financial Assurance | i | |
|
|