Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07144
Well Classification: CBM Status: PR - 1/24/2007
Well Name/No:HILL RANCH #03-02V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/24/2007
FacilityID:258755LocationID:333924
County:LAS ANIMAS #071Location:NWNE 3 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8036 ft.
Basin:RATON BASIN  
Planned Location:1094FNL  1413 FELLat/Long: 37.030495 / -104.870838Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.030490 / -104.870810Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/24/2007             Measured TD: 2461 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/24/2007
Wellbore Permit
Permit #:20001452 Expiration Date:12/13/2001
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/13/2001
Spud Date:1/6/2001Spud Date Is:ACTUAL
Measured TD:2461 ft.Measured PB depth:2429 ft.
True Vertical TD:True Vertical PB depth:
Log Types:INDUCTION, DENSITY, NEUTRON & CBL (CASED HOLE)
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 212 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2452 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 1510 ft., Bottom: 2452 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 40 ft., Bottom: 1510 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2064 ft.NN
VERMEJO COAL2064 ft.2372 ft.NN
TRINIDAD2372 ft.2460 ft.NN

Formation RTON                     Formation Classification:  GW                     Status:  CM - 1/25/2007                 Interval Top: 2128 ft.    Interval Bottom: 2341 ft.

 Completed Information for Formation RATON COAL
1st Production Date:1/24/2007Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:1/12/2007
Treatment Summary:SET RBP @ 2365' PKR @ 2276' PPD 300 GALS 15% HCI AC W/ 1 5% FE AC SWN TBG DISPL AC W/ 25 BPW RLS RBP SET RBP 2275' PKR 2241' PPD 275 GALS 15% HCL AC W/ 1 5% FE AC DWN TBG DISPL W/25 BPW RLS PKR. RBP SET RBP 2241' PKR 2151' PPD 275 GALS 15% HCI AC W/1 5% FE AC DWN TBG DISPL AC W/25 BPW RLS PKR. RBP SET RBP 2151', PKR 2091' PPD 175 GAL 15% HCI AC W/ 1 5% HCI AC DWN TBG DISPL AC W/ 25 BPW RLS PKR. RBP TOH W/ TBG. PKR RBP
Tubing Size:2.875 in.Tubing Setting Depth:2387 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/25/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 67
BTU_GAS 1006
CALC_BBLS_H2O 67
CALC_MCF_GAS 100
CASING_PRESS 2
GRAVITY_OIL 0.562
MCF_GAS 100
TUBING_PRESS 5
Perforation Data:
Interval Top:2128 ft.# Of Holes:136
Interval Bottom:2341 ft.Hole Size:0.45 in.

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/24/2001                 Interval Top: 2128 ft.    Interval Bottom: 2341 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:2/24/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:2/13/2001
Treatment Summary:PERFORATIONS: 2332'-35, 2338'-41' (4 SPF) FRAC 1ST STAGE W/ 20,750 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 40,000# 16/30, 250 GAL 15% HCL PERFORATIONS: 2286'-90' (4 SPF) FRAC 2ND STAGE W/ 20,750 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 40,000# 16/30, 250 GAL. 15% HCL. PERFORATIONS: 2254'-58', 2260'-64' (4 SPF) FRAC 3RD STAGE W/ 28,050 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 60,000# 16/30, 250 GAL. 15% HCL PERFORATIONS: 2203'-07', 2216'-20' (4 SPF) FRAC 4RD STAGE W/ 31,950 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 70,000# 16/30, 250 GAL. 15% HCL PERFORATIONS: 2128'-32' (4 SPF) FRAC 4TH STAGE W/ 17,050 GAL. 20# DELTA FRAC 140 (INC. PAD), 2,500 GAL. LINEAR GEL, 30,000# 16/30, 250 GAL. 15% HCL
Tubing Size:2.875 in.Tubing Setting Depth:2358 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/24/2001Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 150
BBLS_OIL 0
BTU_GAS 984
CALC_BBLS_H2O 150
CALC_BBLS_OIL 0
CALC_MCF_GAS 10
CASING_PRESS 25
MCF_GAS 10
Perforation Data:
Interval Top:2128 ft.# Of Holes:124
Interval Bottom:2341 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:                     Status:  PR - 1/24/2007

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:1/24/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8625
GOR
GOR DeterminationMCFE
Average BOE per Day4.078
Average MCFE per Day23.652

 Federal Financial Assurance  i 

 Tribal Well  i No