Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07143
Well Classification: CBM Status: PR - 10/1/2025
Well Name/No:HILL RANCH #09-01V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2025
FacilityID:258754LocationID:333910
County:LAS ANIMAS #071Location:NENE 9 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8141 ft.
Basin:RATON BASIN  
Planned Location:1058FNL  1082 FELLat/Long: 37.016125 / -104.887769Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.016130 / -104.887810Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2025             Measured TD: 2480 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2025
Wellbore Permit
Permit #:20001451 Expiration Date:12/13/2001
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/4/2001
Spud Date:1/17/2001Spud Date Is:ACTUAL
Measured TD:2480 ft.Measured PB depth:2466 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DENSITY/NEUTRON,SINGLE IND.,CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 212 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2441 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 300 ft., Bottom: 2441 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 300 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2125 ft.NN
VERMEJO COAL2125 ft.2390 ft.NN
TRINIDAD2390 ft.2480 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  PR - 10/1/2025                 Interval Top: 2139 ft.    Interval Bottom: 2377 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:4/10/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:4/4/2001
Treatment Summary:PERFORATIONS: 2373'-2377' (4SPF) FRAC 1ST STAGE W/ 10,874 GAL. FRAC FLUID (INC. PAD), 141,698 SCF N2, 24,900# 16/30 & 250 GAL 15% HCL PERFORATIONS: 2345'-48' (4 SPF) FRAC 2ND STAGE W/ 6,921 GAL. FRAC FLUID (INC. PAD), 99,857 SCF N2, 16,900# 16/30. NO ACID. PERFORATIONS: 2323'-26', 2328'-30' (4 SPF) FRAC 3RD STAGE W/ 6,641 GAL. FRAC FLUID (INC. PAD), 102,187 SCF N2, 16,600# 16/30. NO ACID. PERFORATIONS: 2301'-04' (4 SPF) FRAC 4TH STAGE W/ 11,121 GAL. FRAC FLUID (INC. PAD), 148,724 SCF N2, 16,600# 16/30. NO ACID. PERFORATIONS: 2271'-77' (4 SPF) FRAC 5TH STAGE W/ 14,102 GAL. FRAC FLUID (INC. PAD), 160,000 SCF N2, 16,600# 16/30. NO ACID. PERFORATIONS: 2200'-05' (4 SPF) FRAC 6TH STAGE W/ 13,688 GAL. FRAC FLUID (INC. PAD), 185,789 SCF N2, 16,600# 16/30. NO ACID. PERFORATIONS: 2139'-43' (4 SPF) FRAC 7TH STAGE W/ 9,579 GAL. FRAC FLUID (INC.PAD), 132,447 SCF N2, 16,600# 16/30. NO ACID.
Tubing Size:2.875 in.Tubing Setting Depth:2396 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/11/2001Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 280
BBLS_OIL 0
BTU_GAS 984
CALC_BBLS_H2O 280
CALC_BBLS_OIL 0
CALC_MCF_GAS 73
CASING_PRESS 25
MCF_GAS 73
Perforation Data:
Interval Top:2139 ft.# Of Holes:92
Interval Bottom:2377 ft.Hole Size:4 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)398
GOR
GOR DeterminationMCFE
Average BOE per Day0.183
Average MCFE per Day1.071

 Federal Financial Assurance  i 

 Tribal Well  i No