|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: SI - 6/1/2024 Measured TD: 2480 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM SI - 6/1/2024 | Wellbore Permit | | Permit #: | 20001451 | Expiration Date: | 12/13/2001 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 4/4/2001 | Spud Date: | 1/17/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2480 ft. | Measured PB depth: | 2466 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | COMP.DENSITY/NEUTRON,SINGLE IND.,CBL | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 50, Top: 0 ft., Bottom: 212 ft., Determination Method: CBL | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2441 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 300 ft., Bottom: 2441 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 300 ft., Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 2125 ft. | N | N | VERMEJO COAL | 2125 ft. | 2390 ft. | N | N | TRINIDAD | 2390 ft. | 2480 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: SI - 6/1/2024 Interval Top: 2139 ft. Interval Bottom: 2377 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 4/10/2001 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/4/2001 | Treatment Summary: | PERFORATIONS: 2373'-2377' (4SPF) FRAC 1ST STAGE W/ 10,874 GAL. FRAC FLUID (INC. PAD), 141,698 SCF N2, 24,900# 16/30 & 250 GAL 15% HCL PERFORATIONS: 2345'-48' (4 SPF) FRAC 2ND STAGE W/ 6,921 GAL. FRAC FLUID (INC. PAD), 99,857 SCF N2, 16,900# 16/30. NO ACID. PERFORATIONS: 2323'-26', 2328'-30' (4 SPF) FRAC 3RD STAGE W/ 6,641 GAL. FRAC FLUID (INC. PAD), 102,187 SCF N2, 16,600# 16/30. NO ACID. PERFORATIONS: 2301'-04' (4 SPF) FRAC 4TH STAGE W/ 11,121 GAL. FRAC FLUID (INC. PAD), 148,724 SCF N2, 16,600# 16/30. NO ACID. PERFORATIONS: 2271'-77' (4 SPF) FRAC 5TH STAGE W/ 14,102 GAL. FRAC FLUID (INC. PAD), 160,000 SCF N2, 16,600# 16/30. NO ACID. PERFORATIONS: 2200'-05' (4 SPF) FRAC 6TH STAGE W/ 13,688 GAL. FRAC FLUID (INC. PAD), 185,789 SCF N2, 16,600# 16/30. NO ACID. PERFORATIONS: 2139'-43' (4 SPF) FRAC 7TH STAGE W/ 9,579 GAL. FRAC FLUID (INC.PAD), 132,447 SCF N2, 16,600# 16/30. NO ACID. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2396 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/11/2001 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 280 | BBLS_OIL | 0 | BTU_GAS | 984 | CALC_BBLS_H2O | 280 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 73 | CASING_PRESS | 25 | MCF_GAS | 73 |
| Perforation Data: | Interval Top: | 2139 ft. | # Of Holes: | 92 | Interval Bottom: | 2377 ft. | Hole Size: | 4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 05/31/2024 |
Low Producing | Y | Production Period 07/2024 - 06/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|