|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 3/13/2001 Measured TD: 2425 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 3/13/2001 | Wellbore Permit | | Permit #: | 001305 | Expiration Date: | 11/23/2001 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 2/17/2001 | Spud Date: | 12/6/2000 | Spud Date Is: | ACTUAL | Measured TD: | 2425 ft. | Measured PB depth: | 2399 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | INDUCTION, DENSITY, NEUTRON & CEMENT BOND LOGS | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 53, Top: 0 ft., Bottom: 214 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2409 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 355, Top: 0 ft., Bottom: 2409 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 2025 ft. | N | N | VERMEJO COAL | 2025 ft. | 2340 ft. | N | N | TRINIDAD | 2340 ft. | 2425 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 2/6/2003 Interval Top: 2081 ft. Interval Bottom: 2333 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | No | Production Method: | PUMPING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/17/2001 | Treatment Summary: | PERFORATIONS: 2322'-26, 2329'-33' (4 SPF) FRAC 1ST STAGE W/27,405 GAL. 20 # DELTA FRAC (INC. PAD), 50 ,750# 16/30. NO ACID USED. SEE OGCC COMMENTS........................................................ |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2348 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/13/2001 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 410 | BBLS_OIL | 0 | BTU_GAS | 984 | CALC_BBLS_H2O | 410 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 38 | CASING_PRESS | 25 | MCF_GAS | 38 |
| Perforation Data: | Interval Top: | 2081 ft. | # Of Holes: | 120 | Interval Bottom: | 2333 ft. | Hole Size: | 4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 20721 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 9.755 |
Average MCFE per Day | 56.590 |
Federal Financial Assurance | i | |
|
|