Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07104
Well Classification: CBM Status: PR - 9/14/2006
Well Name/No:HILL RANCH #27-16 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/14/2006
FacilityID:258569LocationID:307870
County:LAS ANIMAS #071Location:SESE 27 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7826 ft.
Basin:RATON BASIN  
Planned Location:1107FSL  1169 FELLat/Long: 37.051034 / -104.870018Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.051010 / -104.869990Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 9/14/2006             Measured TD: 2285 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 9/14/2006
Wellbore Permit
Permit #:001304 Expiration Date:11/23/2001
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/28/2001
Spud Date:12/10/2000Spud Date Is:ACTUAL
Measured TD:2285 ft.Measured PB depth:2255 ft.
True Vertical TD:True Vertical PB depth:
Log Types:INDUCTION, DENSITY, NEUTRON & CEMENT BOND LOGS
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 53, Top: 0 ft., Bottom: 214 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2266 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 2266 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1845 ft.NN
VERMEJO COAL1845 ft.2200 ft.NN
TRINIDAD2200 ft.2285 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/5/2001                  Interval Top: 1876 ft.    Interval Bottom: 2006 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/28/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2057 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/2/2001Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 380
BBLS_OIL 0
BTU_GAS 984
CALC_BBLS_H2O 380
CALC_BBLS_OIL 0
CALC_MCF_GAS 5
CASING_PRESS 25
MCF_GAS 5
Perforation Data:
Interval Top:1876 ft.# Of Holes:108
Interval Bottom:2006 ft.Hole Size:4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/14/2006                 Interval Top: 392 ft.    Interval Bottom: 1854 ft.

 Completed Information for Formation RATON COAL
1st Production Date:9/13/2006Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/23/2006
Treatment Summary:ACIDIZED W/2300 GALS 15% HCL ACID. FRACD W/177,191 GALS 20# DELTA 140 W/EXPEDITE & SANDWEDGE NT CARRYING 11,000 16/30 & 342,145# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1407 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/14/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 122
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 122
CALC_BBLS_OIL 0
CALC_MCF_GAS 14
CASING_PRESS 4
GRAVITY_OIL 1
MCF_GAS 14
TUBING_PRESS 60
Perforation Data:
Interval Top:392 ft.# Of Holes:61
Interval Bottom:1854 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/14/2006

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/14/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16004
GOR
GOR DeterminationMCFE
Average BOE per Day7.555
Average MCFE per Day43.841

 Federal Financial Assurance  i 

 Tribal Well  i No