Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07101
Well Classification: CBM Status: PR - 8/26/2009
Well Name/No:HILL RANCH #34-08 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/26/2009
FacilityID:258553LocationID:307869
County:LAS ANIMAS #071Location:SENE 34 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7983 ft.
Basin:RATON BASIN  
Planned Location:1461FNL  1256 FELLat/Long: 37.043974 / -104.870308Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.043950 / -104.870310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/26/2009             Measured TD: 2410 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/26/2009
Wellbore Permit
Permit #:001285 Expiration Date:11/21/2001
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/19/2001
Spud Date:12/8/2000Spud Date Is:ACTUAL
Measured TD:2410 ft.Measured PB depth:2330 ft.
True Vertical TD:True Vertical PB depth:
Log Types:INDUCITON , DENSITY, NEUTRON & CEMENT BOND LOGS
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 53, Top: 0 ft., Bottom: 214 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2480 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 288, Top: 350 ft., Bottom: 2480 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 52, Top: 0 ft., Bottom: 350 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: , Size: , Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON SAND0 ft.2016 ft.NN
VERMEJO COAL2016 ft.2330 ft.NN
TRINIDAD2330 ft.2410 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/26/2009                 Interval Top: 2029 ft.    Interval Bottom: 2315 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/1/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/17/2009
Treatment Summary:ACIDIZED W/2200 GALS 15% HCL ACID. REFRAC'D W/97588 GAL 20# DELTA 140 W/SANDWEDGE OS CARRYING 14507# 16/30 BRADY SD AND 166044# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 356
BBLS_OIL 0
BTU_GAS 984
CALC_BBLS_H2O 356
CALC_BBLS_OIL 0
CALC_MCF_GAS 39
CASING_PRESS 25
MCF_GAS 39
Perforation Data:
Interval Top:2029 ft.# Of Holes:
Interval Bottom:2315 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/26/2009                 Interval Top: 541 ft.    Interval Bottom: 2315 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/19/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2332 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 34
BTU_GAS 108
CALC_BBLS_H2O 34
CALC_BBLS_OIL 0
CALC_MCF_GAS 15
CASING_PRESS 27
MCF_GAS 15
TUBING_PRESS 4
Perforation Data:
Interval Top:541 ft.# Of Holes:
Interval Bottom:2315 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/26/2009                 Interval Top: 541 ft.    Interval Bottom: 1296 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/24/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/17/2009
Treatment Summary:ACIDIZE W/3000 GALS 15% HCL ACID. FRAC'D W/136518 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 18760# 16/30 BRADY SD AND 278299# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:541 ft.# Of Holes:72
Interval Bottom:1296 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)24390
GOR
GOR DeterminationMCFE
Average BOE per Day11.516
Average MCFE per Day66.796

 Federal Financial Assurance  i 

 Tribal Well  i No