Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07096
Well Classification: GW Status: SI - 1/1/2025
Well Name/No:HILL RANCH #05-05 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:258496LocationID:333960
County:LAS ANIMAS #071Location:SWNW 5 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8097 ft.
Basin:RATON BASIN  
Planned Location:1352FNL  1252 FWLLat/Long: 37.029844 / -104.915970Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.029840 / -104.915940Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2025             Measured TD: 2525 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2025
Wellbore Permit
Permit #:20001246 Expiration Date:11/13/2001
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/14/2000
Spud Date:11/17/2000Spud Date Is:ACTUAL
Measured TD:2525 ft.Measured PB depth:2507 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DENSITY/NEUTRON,INDUCTION & CEMENT BOND
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 45, Top: 0 ft., Bottom: 214 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2525 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 408, Top: 0 ft., Bottom: 2525 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2117 ft.NN
VERMEJO COAL2117 ft.2445 ft.NN
TRINIDAD2445 ft.2525 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  SI - 1/1/2025                  Interval Top: 2198 ft.    Interval Bottom: 2399 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:12/29/2000Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:12/14/2000
Treatment Summary:PERFORATIONS: 2397'-99' (8 HOLES) FRAC 1ST STAGE W/ 13,000 GAL. 20# DELTA FRAC 140 (INC. PAD), 500 GAL. LINEAR GEL, 20,750# 16/30, 250 GAL 15% HCL PERFORATIONS: 2375'-78' (12 HOLES) FRAC 2ND STAGE W/ 20,750 GAL. 20# DELTA FRAC 140 (INC. PAD), 500 GAL. LINEAR GEL, 40,000# 16/30, 250 GAL 15% HCL PERFORATIONS: 2353'-56' (12 HOLES) FRAC 3RD STAGE W/ 20,750 GAL. 20# DELTA FRAC 140 (INC. PAD), 500 GAL. LINEAR GEL, 40,000# 16/30, 250 GAL 15% HCL PERFORATIONS: 2278'-80', 2288'-90' (16 HOLES) FRAC 4TH STAGE W/ 13,000 GAL. 20# DELTA FRAC 140 (INC. PAD), 500 GAL. LINEAR GEL, 20,750# 16/30, 250 GAL 15% HCL PERFORATIONS: 2198'-2200', 2204'-06' (16 HOLES) FRAC 5TH STAGE W/ 13,000 GAL. 20# DELTA FRAC 140 (INC. PAD), 500 GAL. LINEAR GEL, 17,050# 16/30, 250 GAL 15% HCL // ACIDIZED W/ 114,489 GALS 20# DELTA 140 W/ SANDWEDGE NT CARRYING 43,040# 16/30 & 67,700# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2435 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2005Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 114
BBLS_OIL 0
CASING_PRESS 12
MCF_GAS 7
TUBING_PRESS 5
Perforation Data:
Interval Top:2198 ft.# Of Holes:40
Interval Bottom:2399 ft.Hole Size:0.04 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
07/03/2024
Low ProducingYProduction Period
07/2024 - 06/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No