Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07094
Well Classification: CBM Status: PR - 1/29/2000
Well Name/No:HILL RANCH #06-07R
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/29/2000
FacilityID:258488LocationID:333929
County:LAS ANIMAS #071Location:SWNE 6 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8267 ft.
Basin:RATON BASIN  
Planned Location:1509FNL  1606 FELLat/Long: 37.029424 / -104.925760Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.029380 / -104.925700Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/29/2000             Measured TD: 2600 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/29/2000
Wellbore Permit
Permit #:20001238 Expiration Date:11/12/2001
Proposed Depth/Form:2537 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/31/2000
Spud Date:11/15/2000Spud Date Is:ACTUAL
Measured TD:2600 ft.Measured PB depth:2587 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DENSITY, INDUCTION, NEUTRON, CBL&CASED HOLE DENSITY
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 218 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 218 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.625 in., Size: 5.5 in., Top: 0 ft., Depth: 2586 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 564, Top: 0 ft., Bottom: 2586 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2225 ft.NN
VERMEJO COAL2225 ft.2520 ft.NN
TRINIDAD2520 ft.2600 ft.NN

Formation RTON                     Formation Classification:  GW                     Status:  PR - 1/29/2000                 Interval Top: 1464 ft.    Interval Bottom: 2012 ft.

 Completed Information for Formation RATON COAL
1st Production Date:12/29/2000Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:30NO095
Open Hole Completion:
Formation Treatment
Treatment Date:12/31/2000
Treatment Summary:PERFORATIONS: 2010'-12' (12 HOLES) FRAC 1ST STAGE W/ 17,683 GALS 20# DELTA FLUID (INC PAD) AND 20,717# 16/30 SAND, NO ACID PERFORATIONS: 1951'-53' (12 HOLES) FRAC 2ND STAGE W/ 12,366 GALS 20# DELTA FLUID (INC PAD) AND 11,271# 16/30 SAND, NO ACID PERFORATIONS: 1890'-92' (12 HOLES) FRAC 3RD STAGE W/ 13,631 GALS 20# DELTA FLUID (INC PAD) AND 11,438# 16/30 SAND, NO ACID NOTE: VERMEJO FORMATION NOT PERFORATED, NO CHANCE OF COMMUNICATION PERFORATIONS: 1801'-03' (12 HOLES) FRAC 4TH STAGE W/ 15,201 GALS 20# DELTA FLUID (INC PAD) AND 20,715# 16/30 SAND, NO ACID PERFORATIONS: 1515'-1517' AND 1524'-26' (24 HOLES) FRAC 5TH STAGE W/ 21,265 GALS 20# DELTA FLUID (INC PAD) AND 29,967# 16/30 SAND, NO ACID PERFORATIONS: 1493'-1495' (12 HOLES) FRAC 6TH STAGE W/ 15,654 GALS 20# DELTA FLUID (INC PAD) AND 20,187# 16/30 SAND, NO ACID PERFORATIONS: 1457'-1460' AND 1464'-1466' (36 HOLES) FRAC 7TH STAGE W/ 20,946 GALS 20# DELTA FLUID (INC PAD) AND 28,268# 16/30 SAND, NO ACID
Tubing Size:2.875 in.Tubing Setting Depth:2042 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/29/2000Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 194
BBLS_OIL 0
BTU_GAS 984
CALC_BBLS_H2O 194
CALC_BBLS_OIL 0
CALC_MCF_GAS 2
CASING_PRESS 25
MCF_GAS 2
Perforation Data:
Interval Top:1464 ft.# Of Holes:120
Interval Bottom:2012 ft.Hole Size:4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)7616
GOR
GOR DeterminationMCFE
Average BOE per Day3.594
Average MCFE per Day20.861

 Federal Financial Assurance  i 

 Tribal Well  i No