|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/30/2014 Measured TD: 2312 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/30/2014 | | Wellbore Permit | | | Permit #: | 20086565 | Expiration Date: | 10/8/2009 | | Proposed Depth/Form: | 2184 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 341 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 341 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2184 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 325, Top: 52 ft., Bottom: 2184 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/10/2000 | | Spud Date: | 3/9/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 2312 ft. | Measured PB depth: | 2312 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | ARRAY IND, COMP PHOTO-DENSITY, CMT BOND | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 24 ft., Depth: 341 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 341 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 16 ft., Depth: 2184 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 52 ft., Bottom: 2184 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 650 ft. | 1896 ft. | N | N | | VERMEJO COAL | 1946 ft. | 2179 ft. | N | N | | TRINIDAD | 2185 ft. | 2312 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 5/7/2000 Interval Top: 1949 ft. Interval Bottom: 2167 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 5/1/2000 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/10/2000 | | Treatment Summary: | (1949-1953, 1991-1995) (2069-2074) (2129-2133, 2135-2139, 2149-2154, 2157-2161, 2163-2167) TOTAL 1,360,000 70% QUALITY NITROGEN, TOTAL 50,000 LBS 20/40 SAND, AND 200,000 LBS 12/20 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 2251 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/7/2000 | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 500 | | CALC_BBLS_H2O | 500 | | CALC_MCF_GAS | 59 | | CASING_PRESS | 45 | | MCF_GAS | 59 |
| | Perforation Data: | | Interval Top: | 1949 ft. | # Of Holes: | 136 | | Interval Bottom: | 2167 ft. | Hole Size: | |
|
Formation RT-VJ Formation Classification: GW Status: PR - 11/28/2008 Interval Top: 1027 ft. Interval Bottom: 2167 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | Perforation Data: | | Interval Top: | 1027 ft. | # Of Holes: | | | Interval Bottom: | 2167 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 4/30/2014 Interval Top: 1027 ft. Interval Bottom: 1687 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | RATON COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/10/2000 | | Treatment Summary: | (1027-1034, 1044-1047, 1070-1073) (1114-1118, 1140-1143) (1169-1172, 1186-1189, 1223-1227, 1252-1255, 1683-1687) TOTAL 490,898 71% QUALITY NITROGEN, TOTAL 184,734 70% QUALITY NITROGEN |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 2251 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/12/2008 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1015 | | CALC_BBLS_H2O | 137 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 40 | | TUBING_PRESS | 130 |
| | Perforation Data: | | Interval Top: | 1027 ft. | # Of Holes: | 148 | | Interval Bottom: | 1687 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 16107 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 7.604 |
| Average MCFE per Day | 44.103 |
| Federal Financial Assurance | i | |
|
|