|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 2/6/2001 Measured TD: 2150 ft. Vertical TD: 2150 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 2/6/2001 | Wellbore Permit | | Permit #: | 000214 | Expiration Date: | 3/6/2001 | Proposed Depth/Form: | 2430 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 3/27/2000 | Spud Date: | 3/13/2000 | Spud Date Is: | ACTUAL | Measured TD: | 2150 ft. | Measured PB depth: | 2106 ft. | True Vertical TD: | 2150 ft. | True Vertical PB depth: | 2106 ft. | Log Types: | ARRAY IND, COMP PHOTO-DENS, GR | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 341 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 110, Top: , Bottom: 341 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2106 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 310, Top: 54 ft., Bottom: 2106 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1839 ft. | N | N | VERMEJO COAL | 1839 ft. | 2088 ft. | N | N | TRINIDAD | 2088 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 2/6/2001 Interval Top: 1417 ft. Interval Bottom: 2072 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 8/30/2000 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | PROGRESSIVE CAVITY PUMP | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/27/2000 | Treatment Summary: | FOAMED,FRAC'D AND PLACED 250,000 LBS OF PROPPANT. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2021 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/25/2000 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 300 | CALC_BBLS_H2O | 300 | CALC_MCF_GAS | 58 | CASING_PRESS | 24 | MCF_GAS | 58 |
| Perforation Data: | Interval Top: | 1417 ft. | # Of Holes: | 152 | Interval Bottom: | 2072 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 17765 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 8.394 |
Average MCFE per Day | 48.681 |
Federal Financial Assurance | i | |
|
|