|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 12/31/2005 Measured TD: 2020 ft. Vertical TD: 2020 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 12/31/2005 | Wellbore Permit | | Permit #: | 000208 | Expiration Date: | 3/5/2001 | Proposed Depth/Form: | 2318 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 5/8/2000 | Spud Date: | 3/12/2000 | Spud Date Is: | ACTUAL | Measured TD: | 2020 ft. | Measured PB depth: | 1997 ft. | True Vertical TD: | 2020 ft. | True Vertical PB depth: | 1997 ft. | Log Types: | ARRAY IND, COMP PHOTO-DENSITY, GAMMA RAY | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 342 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 125, Top: 0 ft., Bottom: 342 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1998 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 310, Top: 90 ft., Bottom: 1998 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1707 ft. | N | N | VERMEJO COAL | 1707 ft. | 1947 ft. | N | N | TRINIDAD | 1947 ft. | 2020 ft. | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 12/31/2005 Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | N/A | Choke Size: | 2.000 in. | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | PUMPING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/8/2000 | Treatment Summary: | FOAMED, FRAC'D & PLACED 250000# OF PROPPANT. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1939 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/23/2000 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 250 | CALC_BBLS_H2O | 250 | CALC_MCF_GAS | 162 | CASING_PRESS | 11 | MCF_GAS | 162 |
| No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 24131 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 11.396 |
Average MCFE per Day | 66.088 |
Federal Financial Assurance | i | |
|
|