Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06955
Well Classification: CBM Status: PR - 7/27/2004
Well Name/No:VPR C #37
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/27/2004
FacilityID:256872LocationID:307787
County:LAS ANIMAS #071Location:SWNW 3 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7703 ft.
Basin:RATON BASIN  
Planned Location:1412FNL  820 FWLLat/Long: 37.030035 / -104.773095Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.030020 / -104.773090Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/27/2004             Measured TD: 3443 ft.    Vertical TD: 1968 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/27/2004
Wellbore Permit
Permit #:000207 Expiration Date:3/5/2001
Proposed Depth/Form:2363 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:10/6/2006Spud Date Is:ACTUAL
Measured TD:3443 ft.Measured PB depth:2082 ft.
True Vertical TD:1968 ft.True Vertical PB depth:
Top PZ Location:Sec:3 Twp: 35S 66WFootage: 1412 FNL  820 FWL
Bottom Hole Location:Sec:3 Twp: 35S 66WFootage: 1412 FNL  820 FWL
Log Types:ARRAY IND, COMP PHOTO-DENS, GR
Log Types:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 327 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 327 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2081 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 60 ft., Bottom: 2081 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 4.5 in., Size: 3.5 in., Top: 1866 ft., Depth: 3405 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL444 ft.1644 ft.NN
VERMEJO COAL1814 ft.2001 ft.NN
TRINIDAD2014 ft.0 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/27/2004                 Interval Top: 1044 ft.    Interval Bottom: 2002 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:2.000 in.
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:PROGRESSIVE CAVITY PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:7/28/2000
Treatment Summary:FOAMED,FRAC'D AND PLACED 250000# OF PROPPANT.
Tubing Size:2.875 in.Tubing Setting Depth:1993 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/28/2000Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 300
BBLS_OIL 0
CALC_BBLS_H2O 300
CALC_MCF_GAS 90
CASING_PRESS 25
MCF_GAS 90
Perforation Data:
Interval Top:1044 ft.# Of Holes:214
Interval Bottom:2002 ft.Hole Size:

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/27/2004                 Interval Top: 1044 ft.    Interval Bottom: 2002 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1044 ft.# Of Holes:214
Interval Bottom:2002 ft.Hole Size:

Sidetrack #01             Wellbore Classification:              Status: CM - 9/20/2000             Measured TD:

 Wellbore Data for Sidetrack #01Wellbore Classification:         CM - 9/20/2000
Wellbore PermitHORIZONTAL
Permit #:20064195 Expiration Date:10/23/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1492 FNL  941 FWL
Bottom Hole Location:Sec:3 Twp: 35S 66W Footage: 2271 FNL  2130 FWL
Proposed Depth/Form:4044 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 1ST LINER, Hole Size: 4.5 in., Size: 3.5 in., Top: , Depth: 4044 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:N/A
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1492 FNL  941 FWL

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/27/2004                 Interval Top: 1044 ft.    Interval Bottom: 2002 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/30/2006Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/18/2006
Treatment Summary:(1044'-46'; 1055'-57', 1096'-1100', 1111'-13', 1121'-25') (1449'-53', 1499'-1503', 1499'-1503', 1581'-85') (1813'-1822', 1947'-1952', 1986'-96', 1997'-2002')
Tubing Size:2.875 in.Tubing Setting Depth:2045 ft.
Tubing Packer Depth:2082 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1044 ft.# Of Holes:236
Interval Bottom:2002 ft.Hole Size:0.48 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)46881
GOR
GOR DeterminationMCFE
Average BOE per Day22.146
Average MCFE per Day128.446

 Federal Financial Assurance  i 

 Tribal Well  i No