|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 1/4/2000 Measured TD: 2570 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 1/4/2000 | | Wellbore Permit | | | Permit #: | 000013 | Expiration Date: | 1/3/2000 | | Proposed Depth/Form: | 1800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/22/2000 | | Spud Date: | 1/22/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 2570 ft. | Measured PB depth: | 2567 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMP DENS/NEUT & CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 226 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 226 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2543 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 305, Top: 0 ft., Bottom: 2543 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | VERMEJO COAL | 2261 ft. | 2466 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 6/6/2000 Interval Top: 2114 ft. Interval Bottom: 2406 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 3/21/2000 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/22/2000 | | Treatment Summary: | 1ST) 2401-06 20000# 20/40 30000# 16/30 & 290000 SCF N2. 2ND) 1334-38 20000# 20/40 30000# 16/30 & 305000 SCF N2. 3RD) 2260-64' 20000# 20/40 40000# 16/30 & 320000 SCF N2. 4TH 2152-56' 2134-38' 2122-26' 2114-18' 40000# 20/40 & 190000 SCF N2. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2438 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/17/2000 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 120 | | BBLS_OIL | 0 | | BTU_GAS | 1004 | | CALC_BBLS_H2O | 120 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 53 | | CASING_PRESS | 25 | | MCF_GAS | 53 |
| | Perforation Data: | | Interval Top: | 2114 ft. | # Of Holes: | 116 | | Interval Bottom: | 2406 ft. | Hole Size: | 4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 3760 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.779 |
| Average MCFE per Day | 10.322 |
| Federal Financial Assurance | i | |
|
|