|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/1/2005 Measured TD: 2520 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/1/2005 | | Wellbore Permit | | | Permit #: | 000011 | Expiration Date: | 1/3/2000 | | Proposed Depth/Form: | 2600 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/24/2000 | | Spud Date: | 1/26/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 2520 ft. | Measured PB depth: | 2499 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COM DEN, IND, CB | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 227 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 227 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2451 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 2451 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | VERMEJO COAL | 2191 ft. | 2396 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 5/30/2006 Interval Top: 2106 ft. Interval Bottom: 2396 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 3/17/2000 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2000 | | Treatment Summary: | 2392-96,2382-86 FRAC 1ST STAGE W/25000# 20/40 75000# 16/30 & 425000 SCF N2. 2228-30 2220-22 2191-93 FRAC 2ND STATE W/25000# 20/40 75000# 16/30 36 SOLU BALLS & 390000 SCF N2. 2106-16 TREATED ZONE W/: 7.5% HCL. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2405 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/17/2000 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 356 | | BBLS_OIL | 0 | | BTU_GAS | 1004 | | CALC_BBLS_H2O | 326 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 25 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 2106 ft. | # Of Holes: | 96 | | Interval Bottom: | 2396 ft. | Hole Size: | 4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 10/1/2005 Interval Top: 925 ft. Interval Bottom: 2392 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 7/8/2005 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2000 | | Treatment Summary: | |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2427 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/1/2005 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 602 | | BBLS_OIL | 0 | | BTU_GAS | 996 | | CALC_BBLS_H2O | 602 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 111 | | CASING_PRESS | 12 | | MCF_GAS | 111 | | TUBING_PRESS | 15 |
| | Perforation Data: | | Interval Top: | 925 ft. | # Of Holes: | | | Interval Bottom: | 2392 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 7/8/2005 Interval Top: 925 ft. Interval Bottom: 1387 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 7/8/2005 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2000 | | Treatment Summary: | A.W/1,500 GALS 15% HCL AC.FRAC'D W/134,354 GALS 20# DELTA 140 SW NT CARRYING 15,752# 16/30 & 228,327# 12/20 BRADY SD, |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1486 ft. | | Tubing Packer Depth: | 1208 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/8/2005 | Test Method: | PUMPING | | Hours Tested: | 9 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 76 | | CALC_BBLS_H2O | 110 | | CASING_PRESS | 3 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 925 ft. | # Of Holes: | 52 | | Interval Bottom: | 1387 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 13718 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 6.479 |
| Average MCFE per Day | 37.582 |
| Federal Financial Assurance | i | |
|
|