|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 1/4/2000 Measured TD: 2550 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 1/4/2000 | | Wellbore Permit | | | Permit #: | 000009 | Expiration Date: | 1/3/2000 | | Proposed Depth/Form: | 2570 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 8/28/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 2550 ft. | Measured PB depth: | 2511 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMP DENS, SINGL IND & CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 262 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 262 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2511 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 141, Top: 1114 ft., Bottom: 2511 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 917 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 986 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | VERMEJO COAL | 2160 ft. | 2452 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 3/30/2006 Interval Top: 2162 ft. Interval Bottom: 2423 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | 30NO095 | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/23/2000 | | Treatment Summary: | PERFORATIONS; 2420'-23'(4/FT) FRAC 1ST STAGE W/30,00# 16/30 BRADY SAND,15%HCL,LINEAR GEL,DELTA 140-PAD,DELTA 140-SLF,FRESH H2O PREFORATIONS; 2394'-97'(4/FT) FRAC 2ND STAGE W/30,000# 16/30 BRADY SAND, 15% HCL,LINEAR GEL, DELTA 140-PAD, DELTA 140-SLF, |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2453 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/23/2000 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 243 | | BBLS_OIL | 0 | | BTU_GAS | 985 | | CALC_BBLS_H2O | 243 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 190 | | CASING_PRESS | 25 | | MCF_GAS | 190 |
| | Perforation Data: | | Interval Top: | 2162 ft. | # Of Holes: | 64 | | Interval Bottom: | 2423 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 3625 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 1.710 |
| Average MCFE per Day | 9.932 |
| Federal Financial Assurance | i | |
|
|