Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06818
Well Classification: CBM Status: PR - 2/1/2010
Well Name/No:VPR C #8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2010
FacilityID:89238LocationID:307700
County:LAS ANIMAS #071Location:SENW 8 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7737 ft.
Basin:RATON BASIN  
Planned Location:1405FNL  1650 FWLLat/Long: 37.015535 / -104.806416Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.015500 / -104.805870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 9/25/2008             Measured TD: 2130 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 9/25/2008
Wellbore Permit
Permit #:20086568 Expiration Date:10/8/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1405 FNL  1659 FWL
Bottom Hole Location:Sec:8 Twp: 35S 66W Footage: 2223 FNL  605 FWL
Proposed Depth/Form:2867 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 354 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 354 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2098 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 2098 ft.
Casing:String Type: 1ST LINER, Hole Size: 4.5 in., Size: 3.5 in., Top: , Depth: 2867 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 0, Top: , Bottom:

Wellbore Completed
Completion Date:8/23/1999
Spud Date:7/14/1999Spud Date Is:ACTUAL
Measured TD:2130 ft.Measured PB depth:2097 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1405 FNL  1659 FWL
Bottom Hole Location:Sec:8 Twp: 35S 66WFootage: 2223 FNL  605 FWL
Log Types:COMP DEN., ARRAY IND., SFL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 354 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 354 ft., Determination Method: CIRC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2098 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 2098 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1756 ft.NN
VERMEJO COAL1756 ft.2006 ft.NN
TRINIDAD2006 ft.2100 ft.NN
PIERRE2100 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/31/2007                Interval Top: 1760 ft.    Interval Bottom: 1964 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/15/1999Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/23/1999
Treatment Summary:FRAC'D 200,000# OF 20/40, 100,000 # 16/30 MESH SAND & 1,305,000 SCF NITROGEN 70 QUALITY FOAM
Tubing Size:2.875 in.Tubing Setting Depth:1969 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/15/1999Test Method:PC PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 343
BTU_GAS 1000
CALC_BBLS_H2O 343
CALC_MCF_GAS 20
CASING_PRESS 7
MCF_GAS 20
Perforation Data:
Interval Top:1760 ft.# Of Holes:118
Interval Bottom:1964 ft.Hole Size:0.48 in.

Sidetrack #01             Wellbore Classification: CBM             Status: PR - 2/1/2010             Measured TD: 3092 ft.    Vertical TD: 2875 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: CBM        PR - 2/1/2010
Wellbore PermitHORIZONTAL
Permit #:20064198 Expiration Date:10/23/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1405 FNL  1650 FWL
Bottom Hole Location:Sec:8 Twp: 35S 66W Footage: 2223 FNL  605 FWL
Proposed Depth/Form:3851 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:8/14/2006Spud Date Is:ACTUAL
Measured TD:3092 ft.Measured PB depth:2867 ft.
True Vertical TD:2875 ft.True Vertical PB depth:2650 ft.
Top PZ Location:Sec:8 Twp: 35S 66WFootage: 1405 FNL  1650 FWL
Bottom Hole Location:Sec:8 Twp: 35S 66WFootage: 2223 FNL  605 FWL
Log Types:
Log Types:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 23 ft., Depth: 354 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 354 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 16 ft., Depth: 2098 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 40 ft., Bottom: 2098 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 4.5 in., Size: 3.5 in., Top: 1767 ft., Depth: 2867 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1606 ft.NN
VERMEJO COAL1756 ft.2001 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/1/2010                  Interval Top: 1760 ft.    Interval Bottom: 1965 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/25/2006Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/25/2006
Treatment Summary:(1760-64, 1780-82, 1786-88, 1799-1802) (1837-1840, 1843-1846, 1855-1858) (1937-1944, 1963-1965)
Tubing Size:2.875 in.Tubing Setting Depth:2019 ft.
Tubing Packer Depth:2097 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1760 ft.# Of Holes:116
Interval Bottom:1965 ft.Hole Size:0.48 in.

Formation RT-VJ                   Formation Classification:  OW                   Status:  PR - 2/1/2010                  Interval Top: 1004 ft.    Interval Bottom: 1965 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/31/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/1/2010Test Method:METERED
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 989
CALC_MCF_GAS 71
CASING_PRESS 40
MCF_GAS 71
TUBING_PRESS 250
Perforation Data:
Interval Top:1004 ft.# Of Holes:240
Interval Bottom:1965 ft.Hole Size:3.125 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 11/3/2008                 Interval Top: 1004 ft.    Interval Bottom: 1595 ft.

 Completed Information for Formation RATON COAL
1st Production Date:11/3/2008Choke Size:0.125 in.
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/21/2008
Treatment Summary:(1004-1007, 1037-1042, 1066-1070) (1114-1118, 1134-1137, 1160-1063) (1541-1544, 1568-1570, 1577-1579, 1593-1595) TOTAL 598,845 72% QUALITY NITROGEN AND TOTAL 109,983 LBS 20/40 SAND
Tubing Size:2.875 in.Tubing Setting Depth:1978 ft.
Tubing Packer Depth:2073 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/3/2008Test Method:FLOWING
Hours Tested:Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 991
CALC_BBLS_H2O 165
CALC_MCF_GAS 5
CASING_PRESS 12
TUBING_PRESS 250
Perforation Data:
Interval Top:1004 ft.# Of Holes:124
Interval Bottom:1595 ft.Hole Size:3.125 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)50317
GOR
GOR DeterminationMCFE
Average BOE per Day23.759
Average MCFE per Day137.789

 Federal Financial Assurance  i 

 Tribal Well  i No