Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06344
Well Classification: CBM Status: PR - 2/16/2008
Well Name/No:APACHE CANYON #4-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:26922
Facility Status:PRStatus Date2/16/2008
FacilityID:217567LocationID:307379
County:LAS ANIMAS #071Location:SWNE 4 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7193 ft.
Planned Location:2595FNL  1393 FELLat/Long: 37.113313 / -104.888830Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.113270 / -104.888820Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/16/2008             Measured TD: 1570 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/16/2008
Wellbore Permit
Permit #:19960468 Expiration Date:6/12/1997
Proposed Depth/Form:1900 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:1/21/1997
Spud Date:11/24/1996Spud Date Is:ACTUAL
Measured TD:1570 ft.Measured PB depth:1556 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, CDL & NEUTRON LOGS
Casing:String Type: SURF, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 210 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 6.5 in., Size: 4.5 in., Top: 0 ft., Depth: 1567 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL1248 ft.1520 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/14/1997                 Interval Top: 1248 ft.    Interval Bottom: 1520 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:2/14/1997Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/21/1997
Treatment Summary:ACIDIZED W/ 1000 GALS 7.5% HCL. FRACD W/ 72,668 # 20/40 AND 13,272 GALS 30# GELLED H2O 341,050 SCF
Tubing Size:2.375 in.Tubing Setting Depth:1508 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/1997Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 140
BBLS_OIL 0
CALC_BBLS_H2O 140
CALC_BBLS_OIL 0
CALC_MCF_GAS 45
MCF_GAS 45
Perforation Data:
Interval Top:1248 ft.# Of Holes:72
Interval Bottom:1520 ft.Hole Size:0.453125 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/16/2008                 Interval Top: 383 ft.    Interval Bottom: 1029 ft.

 Completed Information for Formation RATON COAL
1st Production Date:2/14/2008Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/30/2008
Treatment Summary:ACIDIZED W/ 1500 GALS 15% HCL. FRACD W/ 84,220 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 18,400 GALS # 16/30 ARIZONA SAND FOLLOWED BY 177,107# 12.20 ARIZONA SAND
Tubing Size:2.875 in.Tubing Setting Depth:1530 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/16/2008Test Method:FLOW
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 90
BBLS_OIL 0
BTU_GAS 1008
CALC_BBLS_H2O 90
CALC_BBLS_OIL 0
CALC_MCF_GAS 79
CASING_PRESS 10
GRAVITY_OIL 1
MCF_GAS 79
TUBING_PRESS 4
Perforation Data:
Interval Top:383 ft.# Of Holes:39
Interval Bottom:1029 ft.Hole Size:0.453125 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/16/2008

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:2/14/2008Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)14751
GOR
GOR DeterminationMCFE
Average BOE per Day6.969
Average MCFE per Day40.409

 Federal Financial Assurance  i 

 Tribal Well  i No