Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06339
Well Classification: CBM Status: PR - 4/1/2022
Well Name/No:APACHE CANYON #18-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:26922
Facility Status:PRStatus Date4/1/2022
FacilityID:217562LocationID:307375
County:LAS ANIMAS #071Location:NESE 18 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7485 ft.
Planned Location:2416FSL  690 FELLat/Long: 37.083353 / -104.923360Lat/Long Source: Field Measured
As Drilled Location:2298 FSL  918 FELLat/Long: 37.083328 / -104.923435Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/1/2022             Measured TD: 1715 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/1/2022
Wellbore Permit
Permit #:960443 Expiration Date:6/6/1997
Bottom Hole Location:Sec:18 Twp: 34S 67W Footage: 2298 FSL  918 FWL
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: 0 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:3/6/1997
Measured TD:1715 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 319 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 126, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 1713 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL1452 ft.

Formation VRMJ                     Formation Classification:  GW                     Status:  AB - 8/6/2007                  Interval Top: 1522 ft.    Interval Bottom: 1657 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/31/1997Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/6/1997
Treatment Summary:ACID W/500 7.5% ACUD. FRAC W/30,666# 20/40 & 6,216 GALS 30# GELLED H2O & 158,058 SCF OF 70% N2 FOAM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 140
BBLS_OIL 0
CALC_BBLS_H2O 0
MCF_GAS 20
Perforation Data:
Interval Top:1522 ft.# Of Holes:88
Interval Bottom:1657 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  PR - 4/1/2022                  Interval Top: 321 ft.    Interval Bottom: 695 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/28/2007Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/6/1997
Treatment Summary:ACIDIZED W/2250 GALS 15% HCL ACID. FRAC'D W/131,844 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 18,000# 16/30 AND 285,703# 12/20 BRADY SAND.
Tubing Size:2.375 in.Tubing Setting Depth:800 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/30/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 0
BTU_GAS 999
CALC_BBLS_H2O 40
CALC_BBLS_OIL 0
CALC_MCF_GAS 6
CASING_PRESS 8
GRAVITY_OIL 1
MCF_GAS 6
TUBING_PRESS 14
Perforation Data:
Interval Top:321 ft.# Of Holes:69
Interval Bottom:695 ft.Hole Size:0.45 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  AB - 8/6/2007

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/28/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)25022
GOR
GOR DeterminationMCFE
Average BOE per Day11.817
Average MCFE per Day68.527

 Federal Financial Assurance  i 

 Tribal Well  i No