Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06271
Well Classification: CBM Status: PR - 2/1/2026
Well Name/No:APACHE CANYON #5-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2026
FacilityID:217494LocationID:333461
County:LAS ANIMAS #071Location:NWSW 5 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7533 ft.
Basin:RATON BASIN  
Planned Location:2094FSL  1219 FWLLat/Long: 37.111773 / -104.915990Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.111770 / -104.916000Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/1/2026             Measured TD: 1488 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/1/2026
Wellbore Permit
Permit #:19960441 Expiration Date:6/6/1997
Proposed Depth/Form:1900 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: 160, Drill Unit: SW4

Wellbore Completed
Completion Date:7/24/1996
Spud Date:6/18/1996Spud Date Is:ACTUAL
Measured TD:1488 ft.Measured PB depth:963 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDNL, CBL, DIL
Casing:String Type: SURF, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 91 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 9, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 963 ft., Weight: 9.5 , Citings Type: ACTUAL
Cement:Sacks: 173, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL397 ft.1470 ft.NN

Formation RTON                     Formation Classification:  GW                     Status:  PR - 2/1/2026                  Interval Top: 609 ft.    Interval Bottom: 615 ft.

 Completed Information for Formation RATON COAL
1st Production Date:10/17/1996Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:BEAM PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:7/24/1996
Treatment Summary:609' - 615' 100 GALS 15% ACID, 600 BW & 26,000# 20/40 SD & 12,000# 10/20 SD.
Tubing Size:2.375 in.Tubing Setting Depth:649 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/9/1996Test Method:BEAM PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 170
CALC_BBLS_H2O 170
CALC_MCF_GAS 100
MCF_GAS 100
Perforation Data:
Interval Top:609 ft.# Of Holes:24
Interval Bottom:615 ft.Hole Size:0.375 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No