Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06214
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:APACHE CANYON #2-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:217437LocationID:307313
County:LAS ANIMAS #071Location:NWNW 2 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7025 ft.
Basin:RATON BASIN  
Planned Location:1300FNL  902 FWLLat/Long: 37.117013 / -104.863479Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.116960 / -104.862970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD: 1441 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:19960466 Expiration Date:6/12/1997
Proposed Depth/Form:1650 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/22/1997
Spud Date:11/18/1996Spud Date Is:ACTUAL
Measured TD:1441 ft.Measured PB depth:1305 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, DIL, CBL
Casing:String Type: SURF, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 224 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 6.5 in., Size: 4.5 in., Top: 0 ft., Depth: 1433 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL1037 ft.1340 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 1103 ft.    Interval Bottom: 1389 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:2/23/1997Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/4/2018Treatment End Date:8/18/2018
Treatment Summary:Perforate Vermejo Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Vermejo Coal intervals including Stage 1 - 1,387' - 89' and 1,356' - 58', Stage 2 - 1,310' - 13', Stage 3 - 1,226' - 28' and 1,219' - 21', Stage 4 - 1,206' - 08' and 1,164' - 65', Stage 5 - 1,136' - 40', 1,129' - 31' and 1,103' - 05' (22' net or 66 holes) with 2-3/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 102,900 gallons of produced water with 96,852 gallons x-link and 111,846 lbs of 20/40 mesh Premium White Sand were pumped. Stage 4 screened out with 1.0 ppg sand downhole concentration. Well was cleaned out to PBTD and returned to production as a commingled Raton- Vermejo well.
Total fluid used in treatment (bbls):4756Max pressure during treatment (psi):3190
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.17
Recycled water used in treatment (bbls):4756Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):111846Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/11/2002
Treatment Summary:Status Change Only
Formation Treatment
Treatment Date:2/22/1997
Treatment Summary:1103' - 1151': ACID W/ 661 GAL 705%ACID, FRAC W/ 35,297# 20/40 & 5,670 GAL 30# GELLED H2O & 140,000 SCF 70% N2 FOAM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 56
BTU_GAS 999
CALC_BBLS_H2O 56
CALC_MCF_GAS 103
CASING_PRESS 48
MCF_GAS 103
Perforation Data:
Interval Top:1103 ft.# Of Holes:66
Interval Bottom:1389 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 268 ft.    Interval Bottom: 1389 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/21/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:268 ft.# Of Holes:135
Interval Bottom:1389 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/25/2018                 Interval Top: 268 ft.    Interval Bottom: 1039 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/9/2018Treatment End Date:9/20/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 6 - 1,037' - 39' and 892' - 94', Stage 7 - 538' - 40', 528' - 30' and 466' - 68', Stage 8 - 351' - 53', 324' - 27', 296' - 301' and 268' - 71' (23' net or 69 holes). A total of 82,992 gallons of produced water with 88,704 galloons x-link and 131,733 lbs of 20/40 mesh Premium White Sand were pumped. All three stages were pumped according to design. The ECWS #33 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton- Vermejo well.
Total fluid used in treatment (bbls):4088Max pressure during treatment (psi):3226
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.17
Recycled water used in treatment (bbls):4088Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):131733Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/25/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 42
BTU_GAS 999
CALC_BBLS_H2O 42
CALC_MCF_GAS 73
CASING_PRESS 2
MCF_GAS 73
Perforation Data:
Interval Top:268 ft.# Of Holes:69
Interval Bottom:1039 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19471
GOR
GOR DeterminationMCFE
Average BOE per Day9.197
Average MCFE per Day53.341

 Federal Financial Assurance  i 

 Tribal Well  i No