Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06200
Well Classification: CBM Status: PR - 2/1/2021
Well Name/No:HILL RANCH #28-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:26926
Facility Status:PRStatus Date2/1/2021
FacilityID:217423LocationID:312086
County:LAS ANIMAS #071Location:NWSE 28 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8024 ft.
Basin:RATON BASIN  
Planned Location:1940FSL  1459 FELLat/Long: 37.053384 / -104.889139Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.053330 / -104.889080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/1/2021             Measured TD: 2560 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/1/2021
Wellbore Permit
Permit #:940873 Expiration Date:1/15/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: 0 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:8/5/1996
Measured TD:2560 ft.Measured PB depth:1700 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 226 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2560 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL260 ft.
VERMEJO COAL2062 ft.
TRINIDAD2383 ft.

Formation RTON                     Formation Classification:  GW                     Status:  PR - 2/1/2021                  Interval Top: 526 ft.    Interval Bottom: 1511 ft.

 Completed Information for Formation RATON COAL
1st Production Date:11/1/2003Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/4/2018Treatment End Date:8/29/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1509' - 11', 1444' - 45' and 1416' - 18', Stage 2 - 1272' - 77', Stage 3 - 1255' - 58', Stage 4 - 1120' - 24', 946' - 48', and 908' - 10', Stage 5 - 892' - 95' and 703' - 05', Stage 6 - 634' - 38' and 526' - 29' (28' net or 84 holes). A total of 207,060 gallons of produced water with 74,718 gallons of x-link and 107,482 lbs of sand were pumped. All six stages were pumped according to design. The ECWS #33 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production.
Total fluid used in treatment (bbls):6709Max pressure during treatment (psi):3760
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.31
Recycled water used in treatment (bbls):6709Total flowback volume recovered (bbls):2363
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):107482Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:8/22/2008
Treatment Summary:Status Change Only
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 69
BTU_GAS 991
CALC_BBLS_H2O 69
CALC_MCF_GAS 16
CASING_PRESS 2
MCF_GAS 16
Perforation Data:
Interval Top:526 ft.# Of Holes:84
Interval Bottom:1511 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)23617
GOR
GOR DeterminationMCFE
Average BOE per Day11.154
Average MCFE per Day64.707

 Federal Financial Assurance  i 

 Tribal Well  i No