Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06191
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:APACHE CANYON #20-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:217414LocationID:307299
County:LAS ANIMAS #071Location:SWNW 20 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7315 ft.
Basin:RATON BASIN  
Planned Location:2628FNL  116 FWLLat/Long: 37.069784 / -104.919830Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.069810 / -104.919870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD:

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:931472 Expiration Date:2/4/1994
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 0 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:N/A
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 223 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 223 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2334 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 0 ft., Bottom: 2334 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL1240 ft.
TRINIDAD1622 ft.
PIERRE1728 ft.
FORT HAYS5084 ft.
GREENHORN5310 ft.

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 1301 ft.    Interval Bottom: 1530 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/30/2005
Treatment Summary:ACIDIZED W/1500 GALS 15% HCL ACID. FRAC'D W/160,800 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 60,200# 16/30 & 214,300# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 95
CALC_BBLS_H2O 95
CALC_MCF_GAS 0
CASING_PRESS 10
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:1301 ft.# Of Holes:48
Interval Bottom:1530 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 273 ft.    Interval Bottom: 1530 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/10/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:273 ft.# Of Holes:126
Interval Bottom:1530 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/18/2018                 Interval Top: 273 ft.    Interval Bottom: 562 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/5/2018Treatment End Date:9/9/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 559' - 62', 523' - 25', 495' - 98' and 486' - 92', Stage 2 - 427' - 31', 382' - 84', 354' - 56', 302' - 04' and 273' - 75' (26' net or 78 holes). A total of 84,000 gallons of produced water with 67,242 gallons of x-link and 64,680 lbs of 20/40 mesh Premium White Sand were pumped. Both stages were pumped according to design. The ECWS #33 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton - Vermejo well.
Total fluid used in treatment (bbls):3601Max pressure during treatment (psi):2631
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.21
Recycled water used in treatment (bbls):3601Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):64680Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/18/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 120
BTU_GAS 999
CALC_BBLS_H2O 120
CALC_MCF_GAS 52
MCF_GAS 52
TUBING_PRESS 25
Perforation Data:
Interval Top:273 ft.# Of Holes:78
Interval Bottom:562 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)37102
GOR
GOR DeterminationMCFE
Average BOE per Day17.537
Average MCFE per Day101.698

 Federal Financial Assurance  i 

 Tribal Well  i No