|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 5/6/2020 Measured TD: Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 5/6/2020 | Wellbore Permit | | Permit #: | 931472 | Expiration Date: | 2/4/1994 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 0 , Unit Acreage: 640, Drill Unit: ALL |
| | |
Wellbore Completed | Completion Date: | N/A | Measured TD: | | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 223 ft., Weight: 48 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: 223 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2334 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 810, Top: 0 ft., Bottom: 2334 ft., Determination Method: VISU | Formation | Interval Top | Log Bottom | Cored | DSTs | VERMEJO COAL | 1240 ft. | | | | TRINIDAD | 1622 ft. | | | | PIERRE | 1728 ft. | | | | FORT HAYS | 5084 ft. | | | | GREENHORN | 5310 ft. | | | |
Formation VRMJ Formation Classification: GW Status: CM - 4/29/2020 Interval Top: 1301 ft. Interval Bottom: 1530 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/30/2005 | Treatment Summary: | ACIDIZED W/1500 GALS 15% HCL ACID. FRAC'D W/160,800 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 60,200# 16/30 & 214,300# 12/20 BRADY SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 95 | CALC_BBLS_H2O | 95 | CALC_MCF_GAS | 0 | CASING_PRESS | 10 | MCF_GAS | 0 | TUBING_PRESS | 2 |
| Perforation Data: | Interval Top: | 1301 ft. | # Of Holes: | 48 | Interval Bottom: | 1530 ft. | Hole Size: | 0.4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 5/6/2020 Interval Top: 273 ft. Interval Bottom: 1530 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 9/10/2018 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RT-VJ. |
| Perforation Data: | Interval Top: | 273 ft. | # Of Holes: | 126 | Interval Bottom: | 1530 ft. | Hole Size: | 0.4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 9/18/2018 Interval Top: 273 ft. Interval Bottom: 562 ft. Completed Information for Formation RATON COAL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | RATON COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/5/2018 | Treatment End Date: | 9/9/2018 | Treatment Summary: | Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 559' - 62', 523' - 25', 495' - 98' and 486' - 92', Stage 2 - 427' - 31', 382' - 84', 354' - 56', 302' - 04' and 273' - 75' (26' net or 78 holes). A total of 84,000 gallons of produced water with 67,242 gallons of x-link and 64,680 lbs of 20/40 mesh Premium White Sand were pumped. Both stages were pumped according to design.
The ECWS #33 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton - Vermejo well. | Total fluid used in treatment (bbls): | 3601 | Max pressure during treatment (psi): | 2631 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 2 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.21 | Recycled water used in treatment (bbls): | 3601 | Total flowback volume recovered (bbls): | 0 | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | | Total proppant used (lbs): | 64680 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/18/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 120 | BTU_GAS | 999 | CALC_BBLS_H2O | 120 | CALC_MCF_GAS | 52 | MCF_GAS | 52 | TUBING_PRESS | 25 |
| Perforation Data: | Interval Top: | 273 ft. | # Of Holes: | 78 | Interval Bottom: | 562 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 38130 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 18.014 |
Average MCFE per Day | 104.482 |
Federal Financial Assurance | i | |
|
|