Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06191
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:APACHE CANYON #20-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:217414LocationID:307299
County:LAS ANIMAS #071Location:SWNW 20 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7315 ft.
Planned Location:2628FNL  116 FWLLat/Long: 37.069784 / -104.919830Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.069810 / -104.919870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD:

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:931472 Expiration Date:2/4/1994
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 0 , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:N/A
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 223 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 223 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2334 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 810, Top: 0 ft., Bottom: 2334 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL1240 ft.
TRINIDAD1622 ft.
PIERRE1728 ft.
FORT HAYS5084 ft.
GREENHORN5310 ft.

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 1301 ft.    Interval Bottom: 1530 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/30/2005
Treatment Summary:ACIDIZED W/1500 GALS 15% HCL ACID. FRAC'D W/160,800 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 60,200# 16/30 & 214,300# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 95
CALC_BBLS_H2O 95
CALC_MCF_GAS 0
CASING_PRESS 10
MCF_GAS 0
TUBING_PRESS 2
Perforation Data:
Interval Top:1301 ft.# Of Holes:48
Interval Bottom:1530 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 273 ft.    Interval Bottom: 1530 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/10/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:273 ft.# Of Holes:126
Interval Bottom:1530 ft.Hole Size:0.4 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/18/2018                 Interval Top: 273 ft.    Interval Bottom: 562 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/5/2018Treatment End Date:9/9/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 559' - 62', 523' - 25', 495' - 98' and 486' - 92', Stage 2 - 427' - 31', 382' - 84', 354' - 56', 302' - 04' and 273' - 75' (26' net or 78 holes). A total of 84,000 gallons of produced water with 67,242 gallons of x-link and 64,680 lbs of 20/40 mesh Premium White Sand were pumped. Both stages were pumped according to design. The ECWS #33 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton - Vermejo well.
Total fluid used in treatment (bbls):3601Max pressure during treatment (psi):2631
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.21
Recycled water used in treatment (bbls):3601Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):64680Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/18/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 120
BTU_GAS 999
CALC_BBLS_H2O 120
CALC_MCF_GAS 52
MCF_GAS 52
TUBING_PRESS 25
Perforation Data:
Interval Top:273 ft.# Of Holes:78
Interval Bottom:562 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)38130
GOR
GOR DeterminationMCFE
Average BOE per Day18.014
Average MCFE per Day104.482

 Federal Financial Assurance  i 

 Tribal Well  i No