Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06190
Well Classification: CBM Status: PR - 9/23/2006
Well Name/No:APACHE CANYON #9-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/23/2006
FacilityID:217413LocationID:307298
County:LAS ANIMAS #071Location:SWNE 9 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8721 ft.
Basin:RATON BASIN  
Planned Location:1600FNL  1800 FELLat/Long: 37.101253 / -104.998183Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.101220 / -104.998170Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 9/23/2006             Measured TD: 6250 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 9/23/2006
Wellbore Permit
Permit #:20062529 Expiration Date:5/22/2007
Proposed Depth/Form:6250 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/20/1994
Spud Date:11/6/1993Spud Date Is:ACTUAL
Measured TD:6250 ft.Measured PB depth:6200 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SFL/TEMP.LOG/COMP. NEUTRON
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 225 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2910 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 945, Top: 0 ft., Bottom: 0 ft., Determination Method:
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 5.5 in., Top: , Depth: 6250 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 4780 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL2134 ft.NN
TRINIDAD2418 ft.NN
PIERRE2542 ft.NN
FORT HAYS6092 ft.NN
CARLILE6106 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/23/2006                 Interval Top: 2043 ft.    Interval Bottom: 2396 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/23/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/20/1994
Treatment Summary:SEE SCANNED DOCUMENT #01320513
Tubing Size:2.875 in.Tubing Setting Depth:2495 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/23/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 46
BBLS_OIL 0
BTU_GAS 1009
CALC_BBLS_H2O 46
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 4
GRAVITY_OIL 0.562
MCF_GAS 0
TUBING_PRESS 13
Perforation Data:
Interval Top:2043 ft.# Of Holes:52
Interval Bottom:2396 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  GW                     Status:  AB - 7/22/2006

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/20/2006
Treatment Summary:SET 5 1/2" CIBP @ 4950'. DUMP BAIL 2 SX CMT ON CIBP. RIH W/5000# 9-5/8" CIBP & SET @ 2648'. DUMP BAIL 2 SX CMT ON CIBP.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20319
GOR
GOR DeterminationMCFE
Average BOE per Day9.598
Average MCFE per Day55.670

 Federal Financial Assurance  i 

 Tribal Well  i No