Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06190
Well Classification: CBM Status: PR - 9/23/2006
Well Name/No:APACHE CANYON #9-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/23/2006
FacilityID:217413LocationID:307298
County:LAS ANIMAS #071Location:SWNE 9 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8721 ft.
Planned Location:1600FNL  1800 FELLat/Long: 37.101253 / -104.998183Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.101220 / -104.998170Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 9/23/2006             Measured TD: 6250 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 9/23/2006
Wellbore Permit
Permit #:20062529 Expiration Date:5/22/2007
Proposed Depth/Form:6250 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/20/1994
Spud Date:11/6/1993Spud Date Is:ACTUAL
Measured TD:6250 ft.Measured PB depth:6200 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SFL/TEMP.LOG/COMP. NEUTRON
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 225 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2910 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 945, Top: 0 ft., Bottom: 0 ft., Determination Method:
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 5.5 in., Top: , Depth: 6250 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 4780 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL2134 ft.NN
TRINIDAD2418 ft.NN
PIERRE2542 ft.NN
FORT HAYS6092 ft.NN
CARLILE6106 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/23/2006                 Interval Top: 2043 ft.    Interval Bottom: 2396 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/23/2006Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/20/1994
Treatment Summary:SEE SCANNED DOCUMENT #01320513
Tubing Size:2.875 in.Tubing Setting Depth:2495 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/23/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 46
BBLS_OIL 0
BTU_GAS 1009
CALC_BBLS_H2O 46
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 4
GRAVITY_OIL 0.562
MCF_GAS 0
TUBING_PRESS 13
Perforation Data:
Interval Top:2043 ft.# Of Holes:52
Interval Bottom:2396 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  GW                     Status:  AB - 7/22/2006

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/20/2006
Treatment Summary:SET 5 1/2" CIBP @ 4950'. DUMP BAIL 2 SX CMT ON CIBP. RIH W/5000# 9-5/8" CIBP & SET @ 2648'. DUMP BAIL 2 SX CMT ON CIBP.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19948
GOR
GOR DeterminationMCFE
Average BOE per Day9.421
Average MCFE per Day54.663

 Federal Financial Assurance  i 

 Tribal Well  i No