Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06171
Well Classification: CBM Status: PR - 9/1/2021
Well Name/No:APACHE CANYON #12-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2021
FacilityID:217395LocationID:307293
County:LAS ANIMAS #071Location:SESE 12 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7900 ft.
Planned Location:370FSL  1080 FELLat/Long: 37.092623 / -104.941431Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.092610 / -104.941410Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/17/2012
End Date: 7/17/2012
Reported: 7/26/2012
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 9/1/2021             Measured TD: 1943 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 9/1/2021
Wellbore Permit
Permit #:19901074 Expiration Date:1/16/1991
Proposed Depth/Form:2025 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/9/1994
Spud Date:10/16/1990Spud Date Is:ACTUAL
Measured TD:1943 ft.Measured PB depth:1890 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/GR; CDT/CNL/GR
Log Types:New CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 200 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 200 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1931 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 706 ft., Bottom: 1931 ft., Determination Method:
Additional Cement:String Type: SURF , Top: 0 ft., Depth: , Bottom: 252 ft., Sacks: 160, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.
VERMEJO COAL1420 ft.
TRINIDAD1788 ft.

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/13/2012                 Interval Top: 1481 ft.    Interval Bottom: 1737 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/21/2012Treatment End Date:N/A
Treatment Summary:STATUS CHANGE ONLY
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/9/1994
Treatment Summary:SEE SCANNED DOCUMENT # 00563291
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1481 ft.# Of Holes:155
Interval Bottom:1737 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/1/2021                  Interval Top: 317 ft.    Interval Bottom: 1737 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/27/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1745 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/28/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1001
CALC_BBLS_H2O 16
CALC_MCF_GAS 90
GRAVITY_OIL 1
TUBING_PRESS 4
Perforation Data:
Interval Top:317 ft.# Of Holes:203
Interval Bottom:1737 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/21/2012                 Interval Top: 317 ft.    Interval Bottom: 1092 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/27/2012Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/17/2012Treatment End Date:7/17/2012
Treatment Summary:Pumped 1750 gals 15% HCl acid. Frac'd w/124,124 gals 20# Delta 140 w/sandwedge OS carrying 274,980# 16/30 Brady sand.
Total fluid used in treatment (bbls):2997Max pressure during treatment (psi):783
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):42Min frac gradient (psi/ft):1.42
Recycled water used in treatment (bbls):2956Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):274980Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:317 ft.# Of Holes:48
Interval Bottom:1092 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)12652
GOR
GOR DeterminationMCFE
Average BOE per Day5.969
Average MCFE per Day34.628

 Federal Financial Assurance  i 

 Tribal Well  i No