Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06171
Well Classification: CBM Status: PR - 9/1/2021
Well Name/No:APACHE CANYON #12-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2021
FacilityID:217395LocationID:307293
County:LAS ANIMAS #071Location:SESE 12 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7900 ft.
Basin:RATON BASIN  
Planned Location:370FSL  1080 FELLat/Long: 37.092623 / -104.941431Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.092610 / -104.941410Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/17/2012
End Date: 7/17/2012
Reported: 7/26/2012
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 9/1/2021             Measured TD: 1943 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 9/1/2021
Wellbore Permit
Permit #:19901074 Expiration Date:1/16/1991
Proposed Depth/Form:2025 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/9/1994
Spud Date:10/16/1990Spud Date Is:ACTUAL
Measured TD:1943 ft.Measured PB depth:1890 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/GR; CDT/CNL/GR
Log Types:New CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 200 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 200 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1931 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 706 ft., Bottom: 1931 ft., Determination Method:
Additional Cement:String Type: SURF , Top: 0 ft., Depth: , Bottom: 252 ft., Sacks: 160, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.
VERMEJO COAL1420 ft.
TRINIDAD1788 ft.

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/13/2012                 Interval Top: 1481 ft.    Interval Bottom: 1737 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/21/2012Treatment End Date:N/A
Treatment Summary:STATUS CHANGE ONLY
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/9/1994
Treatment Summary:SEE SCANNED DOCUMENT # 00563291
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1481 ft.# Of Holes:155
Interval Bottom:1737 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/1/2021                  Interval Top: 317 ft.    Interval Bottom: 1737 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/27/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:1745 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/28/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1001
CALC_BBLS_H2O 16
CALC_MCF_GAS 90
GRAVITY_OIL 1
TUBING_PRESS 4
Perforation Data:
Interval Top:317 ft.# Of Holes:203
Interval Bottom:1737 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/21/2012                 Interval Top: 317 ft.    Interval Bottom: 1092 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/27/2012Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/17/2012Treatment End Date:7/17/2012
Treatment Summary:Pumped 1750 gals 15% HCl acid. Frac'd w/124,124 gals 20# Delta 140 w/sandwedge OS carrying 274,980# 16/30 Brady sand.
Total fluid used in treatment (bbls):2997Max pressure during treatment (psi):783
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):42Min frac gradient (psi/ft):1.42
Recycled water used in treatment (bbls):2956Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):274980Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:317 ft.# Of Holes:48
Interval Bottom:1092 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)11482
GOR
GOR DeterminationMCFE
Average BOE per Day5.426
Average MCFE per Day31.465

 Federal Financial Assurance  i 

 Tribal Well  i No