Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06170
Well Classification: CBM Status: PR - 2/6/2009
Well Name/No:APACHE CANYON #12-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:26922
Facility Status:PRStatus Date2/6/2009
FacilityID:217394LocationID:307292
County:LAS ANIMAS #071Location:SWNW 12 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8480 ft.
Planned Location:1410FNL  325 FWLLat/Long: 37.101853 / -104.954801Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.101880 / -104.954770Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/6/2009             Measured TD: 2317 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/6/2009
Wellbore Permit
Permit #:901073 Expiration Date:1/16/1991
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Measured TD:2317 ft.Measured PB depth:2250 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 205 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 205 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2310 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 500, Top: 1750 ft., Bottom: 2310 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL1849 ft.
TRINIDAD2210 ft.

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/19/1996                 Interval Top: 1849 ft.    Interval Bottom: 2210 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:7/1/1988Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/1996
Treatment Summary:73000# 20/40 SAND, 90,000 SCF NITROGEN
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/19/1996Test Method:PPG
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
CALC_BBLS_H2O 2
CALC_MCF_GAS 45
MCF_GAS 45
TUBING_PRESS 20
Perforation Data:
Interval Top:1849 ft.# Of Holes:24
Interval Bottom:2210 ft.Hole Size:0.375 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 2/6/2009                  Interval Top: 719 ft.    Interval Bottom: 2163 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/23/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/15/2007
Treatment Summary:ACIDIZED W/3750 GALS 15% HCI ACID. FRAC'D W/211,985 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 24,700# 16/30 BRADY SAND AND 472,644# 12/20 ARIZONA SAND.
Tubing Size:2.375 in.Tubing Setting Depth:2173 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/24/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 62
BTU_GAS 1008
CALC_BBLS_H2O 62
CASING_PRESS 4
GRAVITY_OIL 560
TUBING_PRESS 2
Perforation Data:
Interval Top:719 ft.# Of Holes:72
Interval Bottom:2163 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16299
GOR
GOR DeterminationMCFE
Average BOE per Day7.702
Average MCFE per Day44.658

 Federal Financial Assurance  i 

 Tribal Well  i No