Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06144
Well Classification: CBM Status: PR - 4/20/2010
Well Name/No:APACHE CANYON #10-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/20/2010
FacilityID:217368LocationID:307288
County:LAS ANIMAS #071Location:SWNE 10 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8600 ft.
Basin:RATON BASIN  
Planned Location:2100FNL  1882 FELLat/Long: 37.099923 / -104.980322Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.099910 / -104.980350Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/20/2010             Measured TD: 2647 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/20/2010
Wellbore Permit
Permit #:19890709 Expiration Date:12/26/1989
Proposed Depth/Form:2700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:1/5/1990
Spud Date:10/5/1989Spud Date Is:ACTUAL
Measured TD:2647 ft.Measured PB depth:2585 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LDT/CNT; DIL/SFL/GR; CEL; MICROLOG; NGT
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 205 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2647 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL2116 ft.NN
TRINIDAD2414 ft.NN
PIERRE2520 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/20/2010                 Interval Top: 2132 ft.    Interval Bottom: 2411 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:1/8/1990Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2010
Treatment Summary:ACIDIZED W/1,900 GALS 15% HCI ACID, REFRAC'D W/150,357 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 14,210# 16/30 BRADY SD & 252,247# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 300
BBLS_OIL 0
CALC_BBLS_H2O 300
CALC_BBLS_OIL 0
CALC_MCF_GAS 7
CASING_PRESS 5
MCF_GAS 7
Perforation Data:
Interval Top:2132 ft.# Of Holes:233
Interval Bottom:2411 ft.Hole Size:0.7 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 4/20/2010                 Interval Top: 703 ft.    Interval Bottom: 2411 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/29/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/5/1990
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2010Test Method:FLOWING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 989
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 25
CASING_PRESS 1
MCF_GAS 25
TUBING_PRESS 0
Perforation Data:
Interval Top:703 ft.# Of Holes:319
Interval Bottom:2411 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/20/2010                 Interval Top: 703 ft.    Interval Bottom: 1553 ft.

 Completed Information for Formation RATON COAL
1st Production Date:3/29/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/15/2010
Treatment Summary:ACIDIZED W/ 4,300 GALS 15% HCI ACID FRAC'D W/156,911 GALS DELTA 140 W/SANDWEDGE OS CARRYING 26,074# 16/30 BRADY SD & 291,108# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:703 ft.# Of Holes:86
Interval Bottom:1553 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16891
GOR
GOR DeterminationMCFE
Average BOE per Day7.981
Average MCFE per Day46.280

 Federal Financial Assurance  i 

 Tribal Well  i No