Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06135
Well Classification: CBM Status: SI - 1/1/2026
Well Name/No:APACHE CANYON #5-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:217359LocationID:312008
County:LAS ANIMAS #071Location:NESE 5 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7390 ft.
Basin:RATON BASIN  
Planned Location:1939FSL  292 FELLat/Long: 37.111303 / -104.903160Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.111290 / -104.903210Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 1/1/2026             Measured TD: 1865 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 1/1/2026
Wellbore Permit
Permit #:19890678 Expiration Date:12/20/1989
Proposed Depth/Form:2400 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: 640, Drill Unit:

Wellbore Completed
Completion Date:2/21/1990
Spud Date:10/12/1989Spud Date Is:ACTUAL
Measured TD:1865 ft.Measured PB depth:930 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LDT/CNT/ML, DIL/SFL/GR, CBL
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 212 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1865 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1350 ft.NN
TRINIDAD1738 ft.NN
PIERRE1850 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/30/2006                 Interval Top: 1468 ft.    Interval Bottom: 1720 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:2/21/1990Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:ROD PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:2/21/1990
Treatment Summary:1646' - 1720' FRAC W/ 70,000 GAL 30# XL; 234,000# 12/16 SAND
Tubing Size:2.875 in.Tubing Setting Depth:1663 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/22/1990Test Method:ROD PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 1262
CALC_BBLS_H2O 1262
CALC_MCF_GAS 3
CASING_PRESS 5
MCF_GAS 3
Perforation Data:
Interval Top:1468 ft.# Of Holes:181
Interval Bottom:1720 ft.Hole Size:0.7 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/30/2006                 Interval Top: 591 ft.    Interval Bottom: 668 ft.

 Completed Information for Formation RATON COAL
1st Production Date:4/10/1996Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:BEAM PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:2/21/1990
Treatment Summary:591' - 668' 300 GAL 15% ACID; 500 BW & 25,900# 20/40 SAND & 7,000# 10/20 SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1662 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/8/1996Test Method:BEAM PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
CALC_BBLS_H2O 10
CALC_MCF_GAS 100
MCF_GAS 100
Perforation Data:
Interval Top:591 ft.# Of Holes:31
Interval Bottom:668 ft.Hole Size:0.375 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 1/1/2026

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:4/10/1996Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Use
02/24/2025
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No