|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 11/29/1995 Measured TD: 1751 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 11/29/1995 | | Wellbore Permit | | | Permit #: | 19890531 | Expiration Date: | 11/17/1989 | | Proposed Depth/Form: | 2250 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/19/1989 | | Spud Date: | 8/15/1989 | Spud Date Is: | ACTUAL | | Measured TD: | 1751 ft. | Measured PB depth: | 1695 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CORE; LD/CNL/GR; DIL/SFL/GR; CBL/VDL/GR; CEL/CS; ML/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 240 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1751 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 1160 ft., Bottom: , Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | | Y | N | | VERMEJO COAL | 1157 ft. | | Y | N | | TRINIDAD | 1485 ft. | | N | N | | PIERRE | 1593 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 11/29/1995 Interval Top: 1180 ft. Interval Bottom: 1458 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 11/20/1989 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/19/1989 | | Treatment Summary: | 1420' SQZ 75 SX SILICALITE; 1250' SQZ 75 SX SILICALITE; 1180'-1458' F w/ 200M GAL VERMEJO, 332M# 20/40 OTTAWA, 200M# 12/20 COLO SILICA |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1582 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/6/1989 | Test Method: | | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 115 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 115 | | CALC_MCF_GAS | 161 | | MCF_GAS | 161 |
| | Perforation Data: | | Interval Top: | 1180 ft. | # Of Holes: | 252 | | Interval Bottom: | 1458 ft. | Hole Size: | 0.7 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 14320 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 6.763 |
| Average MCFE per Day | 39.209 |
| Federal Financial Assurance | i | |
|
|