|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/1/2025 Measured TD: 1689 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/1/2025 | | Wellbore Permit | | | Permit #: | 19890529 | Expiration Date: | 11/17/1989 | | Proposed Depth/Form: | 1925 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: 640, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | 11/5/1989 | | Spud Date: | 8/8/1989 | Spud Date Is: | ACTUAL | | Measured TD: | 1689 ft. | Measured PB depth: | 1633 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CEL;RFT/MSCT; LDT/CNL/NGT; DIL/GR; HRT/CST; ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 240 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1689 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 572 ft., Bottom: , Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | | Y | N | | VERMEJO COAL | 948 ft. | | Y | N | | TRINIDAD | 1277 ft. | | N | N | | PIERRE | 1365 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 9/1/2025 Interval Top: 962 ft. Interval Bottom: 1245 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 11/7/1989 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | CO ROD PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/5/1989 | | Treatment Summary: | 962' - 1245' F W/192,900 GAL BORAGEL G4190, 332M# 20/40 OTTTAWA SAND, & 200M# COLORADO SILICA (12/20_ |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1330 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/10/1989 | Test Method: | | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 38 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 38 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 186 | | CASING_PRESS | 8 | | MCF_GAS | 186 |
| | Perforation Data: | | Interval Top: | 962 ft. | # Of Holes: | 240 | | Interval Bottom: | 1245 ft. | Hole Size: | 0.7 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 1603 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.756 |
| Average MCFE per Day | 4.376 |
| Federal Financial Assurance | i | |
|
|