Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06129
Well Classification: GW Status: SI - 10/1/2022
Well Name/No:APACHE CANYON #13-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2022
FacilityID:217353LocationID:307279
County:LAS ANIMAS #071Location:NENW 13 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:7880 ft.
Basin:RATON BASIN  
Planned Location:722FNL  2128 FWLLat/Long: 37.089443 / -104.948441Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.089440 / -104.948460Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2022             Measured TD: 2010 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2022
Wellbore Permit
Permit #:19890495 Expiration Date:10/9/1989
Proposed Depth/Form:2075 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/7/1990
Spud Date:9/18/1989Spud Date Is:ACTUAL
Measured TD:2010 ft.Measured PB depth:1910 ft.
True Vertical TD:True Vertical PB depth:
Log Types:ML; LDT/CNTG/GR; FRAC, PERF
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 211 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2010 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 985 ft., Bottom: , Determination Method:
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 650, Top: , Bottom: , Determination Method:
Additional Cement:String Type: 1ST , Top: 30 ft., Depth: 550 ft., Bottom: 590 ft., Sacks: 322, Method: PERF & PUMP
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1383 ft.NN
TRINIDAD1737 ft.NN
PIERRE1832 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  SI - 10/1/2022                 Interval Top: 1431 ft.    Interval Bottom: 1680 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:7/28/2014Treatment End Date:7/30/2014
Treatment Summary:7/28/14 - MIRU. TOH w/pmp & tbg. Tgd PBTD @ 1858. 7/29/14 - Set CIBP @ 1680' FS. TIH w/2-7/8" tbg. EOT @ 1667'. 7/30/14 - TIH w/pmp. RDMO. Std PC pump & RWTP.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/7/1990
Treatment Summary:SEE SCANNED DOCUMENT # 00563383
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 697
BBLS_OIL 0
CALC_BBLS_H2O 697
CALC_MCF_GAS 62
CASING_PRESS 5
MCF_GAS 62
Perforation Data:
Interval Top:1431 ft.# Of Holes:105
Interval Bottom:1680 ft.Hole Size:0.7 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
09/30/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No