Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06127
Well Classification: CBM Status: PR - 8/11/2011
Well Name/No:APACHE CANYON #11-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/11/2011
FacilityID:217351LocationID:307277
County:LAS ANIMAS #071Location:NWNW 11 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8611 ft.
Planned Location:654FNL  785 FWLLat/Long: 37.103933 / -104.971212Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.103920 / -104.971230Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/13/2011
End Date: 7/13/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 278
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/11/2011             Measured TD: 2586 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/11/2011
Wellbore Permit
Permit #:19890493 Expiration Date:10/9/1989
Proposed Depth/Form:2300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: 640, Drill Unit:

Wellbore Completed
Completion Date:1/22/1990
Spud Date:8/31/1989Spud Date Is:ACTUAL
Measured TD:2586 ft.Measured PB depth:2539 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LDT/CNTG; NGT; ML; DIL/SFL; GST/GR; CEL; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 249 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 8.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2585 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 132, Top: 2060 ft., Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 318, Top: 230 ft., Bottom: 1765 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.YN
VERMEJO COAL2068 ft.YN
TRINIDAD2368 ft.YN
PIERRE2480 ft.YN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/8/1995                 Interval Top: 2073 ft.    Interval Bottom: 2363 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:1/22/1990Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:ROD PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:1/22/1990
Treatment Summary:2073'-2155' A W/ 400 GAL 15% HCL, F W/ 88,400 GALS & 275,000# 12/20 COLO SILICA 35# BORATE GEL 2296'-2363' A W/ 2000 GAL 15% HCL, F W/ 82,500 GAL & 120,000# 12/20 COLO SILICA 35# BORATE X-LINK
Tubing Size:2.875 in.Tubing Setting Depth:2218 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/20/1990Test Method:
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 279
BBLS_OIL 0
CALC_BBLS_H2O 279
CALC_BBLS_OIL 0
CALC_MCF_GAS 96
CASING_PRESS 5
MCF_GAS 96
Perforation Data:
Interval Top:2073 ft.# Of Holes:217
Interval Bottom:2363 ft.Hole Size:0.7 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/11/2011                 Interval Top: 707 ft.    Interval Bottom: 2310 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/8/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:2309 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/11/2011Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 36
BTU_GAS 984
CALC_BBLS_H2O 36
CALC_MCF_GAS 50
CASING_PRESS 33
MCF_GAS 50
Perforation Data:
Interval Top:707 ft.# Of Holes:293
Interval Bottom:2310 ft.Hole Size:0.42 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/9/2011                  Interval Top: 707 ft.    Interval Bottom: 1423 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/8/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/13/2011
Treatment Summary:Acidized w/3,500 gals 15% HCl acid. Frac'd w/98,454 gals 20# Delta 140 w/Sandwedge OS carrying 335,300# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:707 ft.# Of Holes:116
Interval Bottom:1423 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16831
GOR
GOR DeterminationMCFE
Average BOE per Day7.949
Average MCFE per Day46.101

 Federal Financial Assurance  i 

 Tribal Well  i No