Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06125
Well Classification: CBM Status: PA - 7/11/2023
Well Name/No:APACHE CANYON #3-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/11/2023
FacilityID:217349LocationID:307275
County:LAS ANIMAS #071Location:SWSE 3 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8539 ft.
Planned Location:560FSL  2295 FELLat/Long: 37.107213 / -104.981872Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.107190 / -104.981890Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: AB - 7/11/2023             Measured TD: 2583 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        AB - 7/11/2023
Wellbore Permit
Permit #:19890491 Expiration Date:10/9/1989
Proposed Depth/Form:2580 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: 640, Drill Unit:

Wellbore Completed
Completion Date:6/30/1990
Spud Date:9/7/1989Spud Date Is:ACTUAL
Measured TD:2583 ft.Measured PB depth:2530 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LDT/CNTG/GR; ML/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 237 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 237 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2583 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 1005 ft., Bottom: 2583 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: 5.5 in., Top: , Depth: 1212 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 1212 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL2030 ft.NN
TRINIDAD2352 ft.NN
PIERRE2464 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/22/1990                 Interval Top: 2066 ft.    Interval Bottom: 2347 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:1/17/1990Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:ROD PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:6/30/1990
Treatment Summary:SEE SCANNED DOC# 00563154
Tubing Size:2.875 in.Tubing Setting Depth:2222 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/22/1990Test Method:
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 325
BBLS_OIL 0
CALC_BBLS_H2O 325
CALC_BBLS_OIL 0
CALC_MCF_GAS 20
CASING_PRESS 5
MCF_GAS 20
Perforation Data:
Interval Top:2066 ft.# Of Holes:284
Interval Bottom:2347 ft.Hole Size:0.7 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  AB - 7/11/2023                 Interval Top: 1092 ft.    Interval Bottom: 2347 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2008
Treatment Summary:Status Change Only
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:1092 ft.# Of Holes:314
Interval Bottom:2347 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/20/1990                 Interval Top: 1092 ft.    Interval Bottom: 2144 ft.

 Completed Information for Formation RATON COAL
1st Production Date:1/17/1990Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:6/30/1990
Treatment Summary:SEE SCANNED DOCUMENT # 00563153
Tubing Size:2.875 in.Tubing Setting Depth:2222 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/1990Test Method:
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 95
BBLS_OIL 0
CALC_BBLS_H2O 95
CALC_MCF_GAS 20
MCF_GAS 20
Perforation Data:
Interval Top:1092 ft.# Of Holes:284
Interval Bottom:2144 ft.Hole Size:0.7 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/11/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No