|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: AB - 7/11/2023 Measured TD: 2583 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM AB - 7/11/2023 | Wellbore Permit | | Permit #: | 19890491 | Expiration Date: | 10/9/1989 | Proposed Depth/Form: | 2580 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: 640, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 6/30/1990 | Spud Date: | 9/7/1989 | Spud Date Is: | ACTUAL | Measured TD: | 2583 ft. | Measured PB depth: | 2530 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | LDT/CNTG/GR; ML/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 237 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 237 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2583 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 1005 ft., Bottom: 2583 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 5.5 in., Top: , Depth: 1212 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 0 ft., Bottom: 1212 ft., Determination Method: VISU | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | | N | N | VERMEJO COAL | 2030 ft. | | N | N | TRINIDAD | 2352 ft. | | N | N | PIERRE | 2464 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 3/22/1990 Interval Top: 2066 ft. Interval Bottom: 2347 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 1/17/1990 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | | Production Method: | ROD PUMP | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/30/1990 | Treatment Summary: | SEE SCANNED DOC# 00563154 |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2222 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/22/1990 | Test Method: | | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | VENTED | |
Test Type | Measure |
---|
BBLS_H2O | 325 | BBLS_OIL | 0 | CALC_BBLS_H2O | 325 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 20 | CASING_PRESS | 5 | MCF_GAS | 20 |
| Perforation Data: | Interval Top: | 2066 ft. | # Of Holes: | 284 | Interval Bottom: | 2347 ft. | Hole Size: | 0.7 in. |
|
Formation RT-VJ Formation Classification: GW Status: AB - 7/11/2023 Interval Top: 1092 ft. Interval Bottom: 2347 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/7/2008 | Treatment Summary: | Status Change Only |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RT-VJ. |
| Perforation Data: | Interval Top: | 1092 ft. | # Of Holes: | 314 | Interval Bottom: | 2347 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 8/20/1990 Interval Top: 1092 ft. Interval Bottom: 2144 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 1/17/1990 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/30/1990 | Treatment Summary: | SEE SCANNED DOCUMENT # 00563153 |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2222 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/20/1990 | Test Method: | | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 95 | BBLS_OIL | 0 | CALC_BBLS_H2O | 95 | CALC_MCF_GAS | 20 | MCF_GAS | 20 |
| Perforation Data: | Interval Top: | 1092 ft. | # Of Holes: | 284 | Interval Bottom: | 2144 ft. | Hole Size: | 0.7 in. |
|
|
|
|
|
Reported Plugged | Y | 07/11/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2028 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|