Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06124
Well Classification: CBM Status: PR - 8/24/2012
Well Name/No:APACHE CANYON #2-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/24/2012
FacilityID:217348LocationID:307274
County:LAS ANIMAS #071Location:SWSW 2 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8615 ft.
Basin:RATON BASIN  
Planned Location:730FSL  660 FWLLat/Long: 37.107813 / -104.971662Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.107810 / -104.971660Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/13/2012
End Date: 7/13/2012
Reported: 8/7/2012
Days to report: 25
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/24/2012             Measured TD: 2600 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/24/2012
Wellbore Permit
Permit #:19890490 Expiration Date:10/9/1989
Proposed Depth/Form:2600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:1/14/1990
Spud Date:9/3/1989Spud Date Is:ACTUAL
Measured TD:2600 ft.Measured PB depth:2520 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LDT/CNL/ML; DIT/SFL/GR; CEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 239 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 239 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2598 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 0 ft., Bottom: 790 ft., Determination Method:
Additional Cement:String Type: SURF , Top: 0 ft., Depth: , Bottom: 239 ft., Sacks: 133, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.
VERMEJO COAL2067 ft.
TRINIDAD2386 ft.
PIERRE2497 ft.

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/24/2012                 Interval Top: 2077 ft.    Interval Bottom: 2379 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/13/1990Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/27/2012Treatment End Date:N/A
Treatment Summary:Status Change Only
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/14/1990
Treatment Summary:SEE SCANNED DOCUMENTS 00563106 & 00563105
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 0
CALC_BBLS_H2O 100
CALC_BBLS_OIL 0
CALC_MCF_GAS 275
CASING_PRESS 5
MCF_GAS 275
Perforation Data:
Interval Top:2077 ft.# Of Holes:168
Interval Bottom:2379 ft.Hole Size:0.7 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/18/2012                 Interval Top: 726 ft.    Interval Bottom: 2379 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/17/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2446 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/18/2012Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1003
CALC_BBLS_H2O 61
CALC_MCF_GAS 126
GRAVITY_OIL 1
TUBING_PRESS 3
Perforation Data:
Interval Top:726 ft.# Of Holes:258
Interval Bottom:2379 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/27/2012                 Interval Top: 726 ft.    Interval Bottom: 1516 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/17/2012Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/13/2012Treatment End Date:7/20/2012
Treatment Summary:Pumped 3,000 gals 15% HCl acid. Frac'd w/202,277 gals 20# Delta 140 w/sandwedge OS carrying 336,600# 16/30 Brady sand.
Total fluid used in treatment (bbls):4888Max pressure during treatment (psi):1197
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:3
Total acid used in treatment (bbls):72Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):4817Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):336600Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:726 ft.# Of Holes:90
Interval Bottom:1516 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19529
GOR
GOR DeterminationMCFE
Average BOE per Day9.221
Average MCFE per Day53.502

 Federal Financial Assurance  i 

 Tribal Well  i No