|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/7/2022 Measured TD: 12366 ft. Vertical TD: 6755 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/7/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/2/2021 | | Proposed Top PZ Location: | Sec:25 Twp: 5N 68W | Footage: 2146 FSL 75 FEL | | Bottom Hole Location: | Sec:25 Twp: 5N 68W | Footage: 2129 FSL 470 FWL | | Proposed Depth/Form: | 12307 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2776 , Unit Acreage: 1920, Drill Unit: SEC 25,29,30:All | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12297 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1438, Top: , Bottom: 12297 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/19/2019 | | Spud Date: | 8/12/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 12366 ft. | Measured PB depth: | 12346 ft. | | True Vertical TD: | 6755 ft. | True Vertical PB depth: | 6755 ft. | | Top PZ Location: | Sec:25 Twp: 5N 68W | Footage: 2151 FSL 26 FEL | | Bottom Hole Location: | Sec:25 Twp: 5N 68W | Footage: 2128 FSL 471 FWL | | Log Types: | CBL, MWD/LWD. (GR/OHL in API 069-06507 ). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1874 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 669, Top: 0 ft., Bottom: 1874 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12358 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1018, Top: 1304 ft., Bottom: 12358 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1351 ft. | | | | | PARKMAN | 3511 ft. | | | | | SUSSEX | 4048 ft. | | | | | SHARON SPRINGS | 7104 ft. | | | | | NIOBRARA | 7199 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/6/2021 Interval Top: 7440 ft. Interval Bottom: 12333 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/28/2021 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 1/4/2021 | Treatment End Date: | 1/10/2021 | | Treatment Summary: | PERF FROM 7440-12333
24 BBLS 15% HCL ACID; 267 BBLS 20% HCR-7000 WL; 57 BBLS 7.5% HCL ACID; 5,070 BBLS PUMP DOWN; 132,431 BBLS SLICKWATER; 137,849 BBLS TOTAL FLUID. 3,936,075 LBS WHITE 40/70 OTTAWA/ST. PETERS; 3,936,075 LBS TOTAL PROPPANT. | | Total fluid used in treatment (bbls): | 137849 | Max pressure during treatment (psi): | 8094 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 18 | | Total acid used in treatment (bbls): | 348 | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | 1200 | Total flowback volume recovered (bbls): | 3495 | | Fresh water used in treatment (bbls): | 136301 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 3936075 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7016 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/4/2021 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 154 | | BBLS_OIL | 294 | | BTU_GAS | 1258 | | CALC_BBLS_H2O | 154 | | CALC_BBLS_OIL | 294 | | CALC_GOR | 2153 | | CALC_MCF_GAS | 633 | | CASING_PRESS | 1200 | | GRAVITY_OIL | 51 | | MCF_GAS | 633 | | TUBING_PRESS | 1000 |
| | Perforation Data: | | Interval Top: | 7440 ft. | # Of Holes: | 70 | | Interval Bottom: | 12333 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 6394 |
| Total Gas Produced (MCF) | 34716 |
| GOR | 5429 |
| GOR Determination | BOE |
| Average BOE per Day | 33.940 |
| Average MCFE per Day | 196.830 |
| Federal Financial Assurance | i | |
|
|