Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-069-06484
Well Classification: OW Status: PR - 4/1/2024
Well Name/No:FOLLEY SOUTH #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2024
FacilityID:447094LocationID:447092
County:LARIMER #069Location:SESE 13 5N68W 6
Field:WATTENBERG - #90750Elevation:4887 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:497FSL  561 FELLat/Long: 40.393842 / -104.946832Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.393844 / -104.946834Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/16/2016
End Date: 9/25/2016
Reported: 10/24/2016
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2024             Measured TD: 17048 ft.    Vertical TD: 7008 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/31/2018
Proposed Top PZ Location:Sec:13 Twp: 5N 68W Footage: 973 FSL  725 FEL
Bottom Hole Location:Sec:14 Twp: 5N 68W Footage: 937 FSL  511 FWL
Proposed Depth/Form:16937 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 42.1 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16927 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2004, Top: , Bottom: 16927 ft.

Wellbore Completed
Completion Date:8/31/2016
Spud Date:8/25/2016Spud Date Is:ACTUAL
Measured TD:17048 ft.Measured PB depth:16945 ft.
True Vertical TD:7008 ft.True Vertical PB depth:7007 ft.
Top PZ Location:Sec:13 Twp: 5N 68WFootage: 973 FSL  725 FEL
Bottom Hole Location:Sec:14 Twp: 5N 68WFootage: 937 FSL  511 FWL
Log Types:CBL, GR/RESISTIVITY
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1843 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 699, Top: 0 ft., Bottom: 1843 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17038 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2320, Top: 36 ft., Bottom: 17038 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3536 ft.
SUSSEX3927 ft.
SHANNON4581 ft.
SHARON SPRINGS6952 ft.
NIOBRARA7026 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2024                  Interval Top: 7513 ft.    Interval Bottom: 16934 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/4/2016Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/16/2016Treatment End Date:9/25/2016
Treatment Summary:"PERF AND FRAC FROM 7513-16,934. 543 BBL 7.5% HCL ACID, 14,213 BBL PUMP DOWN, 256,745 BBL SLICKWATER, - 271,501 BBL TOTAL FLUID 7,490,318# 40/70 PREMIUM, - 7,490,318# TOTAL SAND."
Total fluid used in treatment (bbls):271501Max pressure during treatment (psi):7812
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:47
Total acid used in treatment (bbls):543Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):14266
Fresh water used in treatment (bbls):270958Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7490318Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/14/2016Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 402
BTU_GAS 1392
CALC_BBLS_H2O 1
CALC_BBLS_OIL 402
CALC_GOR 681
CALC_MCF_GAS 274
CASING_PRESS 1107
GRAVITY_OIL 51
MCF_GAS 274
Perforation Data:
Interval Top:7513 ft.# Of Holes:843
Interval Bottom:16934 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4244
Total Gas Produced (MCF)46803
GOR11028
GOR DeterminationBOE
Average BOE per Day33.792
Average MCFE per Day196.002

 Federal Financial Assurance  i 

 Tribal Well  i No