Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-069-06445
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:MIRACLE #33N-12HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:429697LocationID:429698
Municipality/County:JOHNSTOWN / LARIMER #069Location:SESE 12 5N68W 6
Field:WATTENBERG - #90750Elevation:4951 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:712FSL  255 FELLat/Long: 40.408929 / -104.945458Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.408929 / -104.945458Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/9/2013
End Date: 10/10/2013
Reported: 11/25/2013
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 11657 ft.    Vertical TD: 7060 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/26/2014
Proposed Top PZ Location:Sec:12 Twp: 5N 68W Footage: 1100 FSL  620 FEL
Bottom Hole Location:Sec:12 Twp: 5N 68W Footage: 1100 FSL  460 FWL
Proposed Depth/Form:11776 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 937 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 700, Top: 0 ft., Bottom: 937 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7358 ft., Weight: 26.0 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 7358 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6341 ft., Depth: 11776 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/30/2013
Spud Date:3/24/2013Spud Date Is:ACTUAL
Measured TD:11657 ft.Measured PB depth:11633 ft.
True Vertical TD:7060 ft.True Vertical PB depth:7060 ft.
Top PZ Location:Sec:12 Twp: 5N 68WFootage: 925 FSL  730 FEL
Bottom Hole Location:Sec:12 Twp: 5N 68WFootage: 941 FSL  486 FWL
Log Types:CBL, GR, RES, MUD
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 958 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 388, Top: 0 ft., Bottom: 958 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7371 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 745, Top: 544 ft., Bottom: 7371 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6343 ft., Depth: 11642 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS898 ft.
PARKMAN3485 ft.
SUSSEX4229 ft.
SHARON SPRINGS6924 ft.
NIOBRARA6988 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 7435 ft.    Interval Bottom: 11657 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/15/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/9/2013Treatment End Date:10/10/2013
Treatment Summary:COMPLETED THROUGH AN OPEN HOLE LINER FROM 7435-11657. 6642 BBL CROSSLINK GEL,806 BBL LINEAR GEL,76395 BBL SLICKWATER,83842 BBL TOTAL FLUID. 186796# 30/50 OTTAWA/ST. PETERS SAND,1869834# 40/70 OTTAWA/ST. PETERS SAND,2056630# TOTAL SAND.
Total fluid used in treatment (bbls):83842Max pressure during treatment (psi):7396
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10072
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2056630Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6962 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/28/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 93
BBLS_OIL 208
BTU_GAS 1259
CALC_BBLS_H2O 93
CALC_BBLS_OIL 208
CALC_GOR 986
CALC_MCF_GAS 205
CASING_PRESS 1338
GRAVITY_OIL 45
MCF_GAS 205
TUBING_PRESS 1027
Perforation Data:
Interval Top:7435 ft.# Of Holes:0
Interval Bottom:11657 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1519
Total Gas Produced (MCF)1785
GOR1175
GOR DeterminationBOE
Average BOE per Day4.961
Average MCFE per Day28.788

 Federal Financial Assurance  i 

 Tribal Well  i No