Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-069-06415
Well Classification: OW Status: PA - 6/19/2020
Well Name/No:MIRACLE #8-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/19/2020
FacilityID:418096LocationID:333301
Municipality/County:JOHNSTOWN / LARIMER #069Location:NESE 12 5N68W 6
Field:WATTENBERG - #90750Elevation:4948 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2480FSL  285 FELLat/Long: 40.413782 / -104.945468Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.413785 / -104.945475Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/2/2012
End Date: 3/2/2012
Reported: 5/1/2012
Prior to rule 205A.b.(2)(A)
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/19/2020             Measured TD: 7981 ft.    Vertical TD: 7829 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/19/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/1/2012
Proposed Top PZ Location:Sec:12 Twp: 5N 68W Footage: 1850 FNL  750 FEL
Bottom Hole Location:Sec:12 Twp: 5N 68W Footage: 1850 FNL  750 FEL
Proposed Depth/Form:7920 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 455, Top: , Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7920 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 7920 ft.

Wellbore Completed
Completion Date:9/2/2010
Spud Date:8/29/2010Spud Date Is:ACTUAL
Measured TD:7981 ft.Measured PB depth:7941 ft.
True Vertical TD:7829 ft.True Vertical PB depth:7789 ft.
Top PZ Location:Sec:12 Twp: 5N 68WFootage: 1842 FNL  722 FEL
Bottom Hole Location:Sec:12 Twp: 5N 68WFootage: 1843 FNL  721 FEL
Log Types:Preliminary Form 5
Log Types:OH LOGS BRIDGED OUT @ 2100' CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 684 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 684 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7971 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 617, Top: 3774 ft., Bottom: 7971 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3687 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 433, Top: 20 ft., Bottom: 3687 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4248 ft.
SHANNON4703 ft.
NIOBRARA7050 ft.
CODELL7370 ft.
J SAND7832 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 6/19/2020                 Interval Top: 7812 ft.    Interval Bottom: 7851 ft.

 Completed Information for Formation J SAND
1st Production Date:6/13/2011Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/22/2010
Treatment Summary:Frac J-Sand down 4-1/2" Csg w/ 500 gal 15% HCl & 153,958 gal Slickwater w/ 116,160# 40/70, 4,000# SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1284
CALC_GOR 2500
CALC_MCF_GAS 1
CASING_PRESS 1650
GRAVITY_OIL 46
MCF_GAS 1
TUBING_PRESS 1850
Perforation Data:
Interval Top:7812 ft.# Of Holes:72
Interval Bottom:7851 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/21/2012                 Interval Top: 7348 ft.    Interval Bottom: 7368 ft.

 Completed Information for Formation CODELL
1st Production Date:3/6/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/2/2012
Treatment Summary:CD PERF 7348-7368 HOLES 60 SIZE 0.38 Frac CODL down 4.5" casing w/ 127,974 gal w/ 220,000# 20/40, 4,000# SB Excel. Broke @ 3,864 psi @ 2.7 bpm. ATP=3,298 psi; MTP=3,864 psi; ATR=20.6 bpm; ISDP=2,991 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7348 ft.# Of Holes:60
Interval Bottom:7368 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/19/2020                 Interval Top: 7028 ft.    Interval Bottom: 7368 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/6/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/2/2012
Treatment Summary:NB PERF 7028-7232 HOLES 62 SIZE 0.42 CD PERF 7348-7368 HOLES 60 SIZE 0.38
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/7/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 100
BTU_GAS 1255
CALC_BBLS_OIL 100
CALC_GOR 1000
CALC_MCF_GAS 100
CASING_PRESS 1300
GRAVITY_OIL 45
MCF_GAS 100
Perforation Data:
Interval Top:7028 ft.# Of Holes:122
Interval Bottom:7368 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/21/2012                 Interval Top: 7028 ft.    Interval Bottom: 7232 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/6/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/2/2012
Treatment Summary:NB PERF 7028-7232 HOLES 62 SIZE 0.42 Frac NBRR down 4.5" casing w/ 250 gal 15% HCl & 171,992 gal w/ 250,100# 20/40, 4,000# SB Excel. Broke @ 3,017 psi @ 2.3 bpm. ATP=4,877 psi; MTP=5,303 psi; ATR=49.6 bpm; ISDP=3,048 psi
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7028 ft.# Of Holes:62
Interval Bottom:7232 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/19/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No