|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: PA - 8/5/2015 Measured TD: 5241 ft. Vertical TD: 4951 ft. Wellbore Data for Original Wellbore | Wellbore Classification: ERIW PA - 8/5/2015 | Wellbore Permit | DIRECTIONAL | Permit #: | 19920557 | Expiration Date: | 9/26/1992 | Proposed Top PZ Location: | Sec:31 Twp: 8N 68W | Footage: 913 FNL 1882 FEL | Bottom Hole Location: | Sec:31 Twp: 8N 68W | Footage: 953 FNL 1848 FEL | Proposed Depth/Form: | 5024 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | MUDDY SANDSTONE | Unit Number: | | Formation And Spacing: | Code: MDDYJ , Formation: MUDDY J , Order: 84-2 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 9/5/1992 | Spud Date: | 6/14/1992 | Spud Date Is: | ACTUAL | Measured TD: | 5241 ft. | Measured PB depth: | 5190 ft. | True Vertical TD: | 4951 ft. | True Vertical PB depth: | 4906 ft. | Bottom Hole Location: | Sec:30 Twp: 8n 68w | Footage: 953 FNL 1848 FEL | Log Types: | | Log Types: | DIL, GR, DENSITY/NEUTRON, CIBL, CBL | Casing: | String Type: SURF, Hole Size: 13.25 in., Size: 9.625 in., Top: 0 ft., Depth: 505 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 410, Top: 0 ft., Bottom: 505 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 5241 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 3620 ft., Bottom: 5241 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 870 ft., Depth: 1210 ft., Bottom: 1172 ft., Sacks: 151, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | SHANNON | 1356 ft. | | | | NIOBRARA | 4121 ft. | | | | FORT HAYS | 4493 ft. | | | | CODELL | 4521 ft. | | | | BENTONITE | 4854 ft. | | | | MUDDY J | 5122 ft. | | | |
Formation MDDYJ Formation Classification: GW Status: AB - 8/5/2015 Interval Top: 5124 ft. Interval Bottom: 5174 ft. Completed Information for Formation MUDDY J | 1st Production Date: | 5/29/2002 | Choke Size: | | Formation Name: | MUDDY J | Commingled: | | Production Method: | INJECTION | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/5/1992 | Treatment Summary: | 1500 GAL 3% HCL W/BALL SEALERS, FRAC W/250,000# 16/30 SAND IN CROSSLINKED WATER BASE GEL |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/22/1992 | Test Method: | BEAM PUMP | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
CALC_BBLS_H2O | 69 | CALC_BBLS_OIL | 69 | CASING_PRESS | 11 | GRAVITY_OIL | 36 |
| Perforation Data: | Interval Top: | 5124 ft. | # Of Holes: | 51 | Interval Bottom: | 5174 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | Y | 08/05/2015 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|