Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 This operator is no longer active in the State of Colorado.
 Surface Location
 API# 05-069-06315
Well Classification: ERIW Status: IJ - 8/1/2023
Well Name/No:MSSU #30-19 (OWP)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PROSPECT ENERGY LLC - 10312
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date8/1/2023
FacilityID:217128LocationID:333087
Municipality/County:FORT COLLINS / LARIMER #069Location:SWSE 30 8N68W 6
Field:FORT COLLINS - #25100Elevation:5065 ft.
Planned Location:244FSL  2486 FELLat/Long: 40.625510 / -105.047912Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.625539 / -105.047822Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: IJ - 8/1/2023             Measured TD: 4950 ft.    Vertical TD: 4811 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        IJ - 8/1/2023
Wellbore PermitDIRECTIONAL
Permit #:19920555 Expiration Date:9/26/1992
Proposed Depth/Form:4792 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:MUDDY SANDSTONE Unit Number: 
Formation And Spacing:Code: MDDYJ , Formation: MUDDY J , Order: 84-2 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/7/1992
Spud Date:7/25/1992Spud Date Is:ACTUAL
Measured TD:4950 ft.Measured PB depth:4896 ft.
True Vertical TD:4811 ft.True Vertical PB depth:4762 ft.
Bottom Hole Location:Sec:30 Twp: 8N 68WFootage: 1038 FSL  2620 FEL
Log Types:REMEDIAL CEMENT
Log Types:DIL, GR, DENSITY, NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 479 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 4950 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 3640 ft., Bottom: , Determination Method:
Additional Cement:String Type: 1ST , Top: 2500 ft., Depth: 3094 ft., Bottom: 3094 ft., Sacks: 100, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: , Depth: 2980 ft., Bottom: , Sacks: 100, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 650 ft., Bottom: 650 ft., Sacks: 125, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
SHANNON1356 ft.
NIOBRARA3923 ft.
FORT HAYS4241 ft.
CODELL4263 ft.
BENTONITE4553 ft.
MUDDY J4794 ft.

Formation MDDYJ                   Formation Classification:  GW                   Status:  IJ - 8/1/2023                  Interval Top: 4794 ft.    Interval Bottom: 4852 ft.

 Completed Information for Formation MUDDY J
1st Production Date:10/13/1992Choke Size: 
Formation Name:MUDDY JCommingled:
Production Method:BEAM PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:10/7/1992
Treatment Summary:BROKE DOWN PERFS W/1000 GALS 3% HCL, FRAC W/130,000# 16/30 SAND IN CROSS LINKED WATER BASE GEL
Tubing Size:2.875 in.Tubing Setting Depth:4828 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/21/1992Test Method:BEAM PUMP
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_H2O 106.3
CALC_BBLS_OIL 89.9
CASING_PRESS 14
GRAVITY_OIL 36
Perforation Data:
Interval Top:4794 ft.# Of Holes:59
Interval Bottom:4852 ft.Hole Size:0.4 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
12/31/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No