|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 9/1/2022 Measured TD: 4990 ft. Vertical TD: 4829 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 9/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 19920547 | Expiration Date: | 9/26/1992 | | Proposed Top PZ Location: | Sec:19 Twp: 8N 68W | Footage: 1533 FSL 197 FWL | | Bottom Hole Location: | Sec:19 Twp: 8N 68W | Footage: 1500 FSL 182 FWL | | Proposed Depth/Form: | 4826 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | MUDDY SANDSTONE | Unit Number: | | | Formation And Spacing: | Code: MDDYJ , Formation: MUDDY J , Order: 84-2 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/3/1992 | | Spud Date: | 7/15/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 4990 ft. | Measured PB depth: | 4848 ft. | | True Vertical TD: | 4829 ft. | True Vertical PB depth: | 4789 ft. | | Top PZ Location: | Sec:19 Twp: 8N 68W | Footage: 1533 FSL 197 FWL | | Log Types: | DIL, GR, NEUTRON/DENSITY, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 501 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 4990 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 470, Top: 3304 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 1145 ft. | | | | | NIOBRARA | 3863 ft. | | | | | FORT HAYS | 4249 ft. | | | | | CODELL | 4274 ft. | | | | | BENTONITE | 4604 ft. | | | | | MUDDY J | 4870 ft. | | | |
Formation MDDYJ Formation Classification: OW Status: SI - 9/1/2022 Interval Top: 4872 ft. Interval Bottom: 4933 ft.| Completed Information for Formation MUDDY J | | 1st Production Date: | 7/30/2002 | Choke Size: | | | Formation Name: | MUDDY J | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/3/1992 | | Treatment Summary: | 1500 GAL WATER W/BALL SEALERS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1126 | | TUBING_PRESS | 540 |
| | Perforation Data: | | Interval Top: | 4872 ft. | # Of Holes: | 62 | | Interval Bottom: | 4933 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 08/31/2009 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|