|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/10/1994 Measured TD: 5210 ft. Vertical TD: 5179 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/10/1994 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 19920482 | Expiration Date: | 9/10/1992 | | Proposed Depth/Form: | 5151 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | MUDDY SANDSTONE | Unit Number: | | | Formation And Spacing: | Code: MDDYJ , Formation: MUDDY J , Order: 84-2 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/17/1992 | | Spud Date: | 5/21/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 5210 ft. | Measured PB depth: | 5162 ft. | | True Vertical TD: | 5179 ft. | True Vertical PB depth: | 5132 ft. | | Log Types: | DIL, DENSITY, NEUTRON, GR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 506 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5206 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 3869 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 1660 ft. | | | | | NIOBRARA | 4224 ft. | | | | | FORT HAYS | 4548 ft. | | | | | CODELL | 4573 ft. | | | | | BENTONITE | 4848 ft. | | | | | MUDDY J | 5080 ft. | | | |
Formation MDDYJ Formation Classification: GW Status: SI - 10/10/1994 Interval Top: 5081 ft. Interval Bottom: 5121 ft.| Completed Information for Formation MUDDY J | | 1st Production Date: | 7/15/1992 | Choke Size: | | | Formation Name: | MUDDY J | Commingled: | | | Production Method: | INJECTION | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/17/1992 | | Treatment Summary: | 500 GALS 3% HCL FRAC'D W/240,000# 16/30 SAND IN CROSS LINKED WATER BASE GEL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4958 ft. | | Tubing Packer Depth: | 4958 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/29/1992 | Test Method: | INJECTION | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1050 | | TUBING_PRESS | 1120 |
| | Perforation Data: | | Interval Top: | 5081 ft. | # Of Holes: | 43 | | Interval Bottom: | 5121 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Defined Inactive 01/01/1999 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|