|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: IJ - 1/1/2022 Measured TD: 5330 ft. Vertical TD: 5146 ft. Wellbore Data for Original Wellbore | Wellbore Classification: DSPW IJ - 1/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | 19890953 | Expiration Date: | 2/25/1990 | Proposed Depth/Form: | 4924 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | MUDDY SANDSTONE | Unit Number: | | Formation And Spacing: | Code: MDDYJ , Formation: MUDDY J , Order: 84-2 , Unit Acreage: 0, Drill Unit: | Casing: | String Type: 2ND, Hole Size: 4.95 in., Size: 4.5 in., Top: 0 ft., Depth: 5145 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 120, Top: 0 ft., Bottom: 5145 ft. |
| | |
Wellbore Completed | Completion Date: | 11/18/1989 | Spud Date: | 11/4/1989 | Spud Date Is: | ACTUAL | Measured TD: | 5330 ft. | Measured PB depth: | 5296 ft. | True Vertical TD: | 5146 ft. | True Vertical PB depth: | 5113 ft. | Top PZ Location: | Sec:30 Twp: 8N 68W | Footage: 1682 FSL 815 FWL | Bottom Hole Location: | Sec:30 Twp: 8N 68W | Footage: 1634 FSL 805 FWL | Log Types: | | Log Types: | DIL/FOC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 482 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: 482 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 5330 ft., Weight: 14, 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 425, Top: 3400 ft., Bottom: 5330 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 5.5 in., Size: 4.5 in., Top: 0 ft., Depth: 5152 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 170, Top: 300 ft., Bottom: 5157 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 875 ft. | | | | SHANNON | 1225 ft. | | | | NIOBRARA | 4080 ft. | | | | TIMPAS | 4462 ft. | | | | CODELL | 4486 ft. | | | | GREENHORN | 4579 ft. | | | | BENTONITE | 4816 ft. | | | | MUDDY J | 5192 ft. | | | | SKULL CREEK | 5265 ft. | | | |
Formation MDDY Formation Classification: ERIW Status: CM - 8/29/2019 Interval Top: 5196 ft. Interval Bottom: 5256 ft. Completed Information for Formation MUDDY | 1st Production Date: | N/A | Choke Size: | | Formation Name: | MUDDY | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5127 ft. | Tubing Packer Depth: | 5133 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MDDY. |
| Perforation Data: | Interval Top: | 5196 ft. | # Of Holes: | 61 | Interval Bottom: | 5256 ft. | Hole Size: | 0.41 in. |
|
Formation MDDYJ Formation Classification: GW Status: IJ - 1/1/2022 Interval Top: 5196 ft. Interval Bottom: 5256 ft. Completed Information for Formation MUDDY J | 1st Production Date: | 12/1/1989 | Choke Size: | | Formation Name: | MUDDY J | Commingled: | | Production Method: | INJECTION | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/1/1989 | Treatment Summary: | 2000 GAL 7.5% HCL W/RCN BALLS FOR DIVERTER |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5042 ft. | Tubing Packer Depth: | 5043 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation MDDYJ. |
| Perforation Data: | Interval Top: | 5196 ft. | # Of Holes: | 61 | Interval Bottom: | 5256 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (UIC) | Y | Defined Inactive 01/31/2024 |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|