|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2024 Measured TD: 6233 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2024 | | Wellbore Permit | | | Permit #: | 20081122 | Expiration Date: | 3/26/2009 | | Proposed Depth/Form: | 6233 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LYNS , Formation: LYONS , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 210 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 210 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 6233 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 5710 ft., Bottom: 6233 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 11/19/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 6233 ft. | Measured PB depth: | 4660 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | DUAL INDUCTION, DENSITY-NEUTRON W/GAMMA RAY W/CALIPER, SPECTRALOG, DIPLOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 210 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 210 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6233 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 4950 ft., Bottom: 6233 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4950 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 3250 ft., Bottom: 4950 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: 725 ft., Bottom: 725 ft., Sacks: 400, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 1069 ft. | | | | | SHANNON | 1437 ft. | | | | | NIOBRARA | 3880 ft. | | | | | FORT HAYS | 4197 ft. | | | | | CODELL | 4215 ft. | | | | | CARLILE | 4228 ft. | | | | | BENTONITE | 4502 ft. | | | | | MUDDY J | 4718 ft. | | | | | SKULL CREEK | 4853 ft. | | | | | DAKOTA | 4929 ft. | | | | | FUSON | 4953 ft. | | | | | MORRISON | 5042 ft. | | | | | ENTRADA | 5297 ft. | | | | | LYKINS | 5434 ft. | | | Y | | BLAINE | 6078 ft. | | | | | LYONS | 6125 ft. | | | |
Formation LYNS Formation Classification: OW Status: AB - 7/1/2008 Interval Top: 6127 ft. Interval Bottom: 6166 ft.| Completed Information for Formation LYONS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | LYONS | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation LYNS. |
| | Perforation Data: | | Interval Top: | 6127 ft. | # Of Holes: | 60 | | Interval Bottom: | 6166 ft. | Hole Size: | |
|
Formation DKTA Formation Classification: OW Status: AB - 7/2/2002 Interval Top: 4930 ft. Interval Bottom: 4936 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/1992 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | Perforation Data: | | Interval Top: | 4930 ft. | # Of Holes: | | | Interval Bottom: | 4936 ft. | Hole Size: | |
|
Formation MDDYJ Formation Classification: OW Status: AB - 12/21/1999 Interval Top: 4720 ft. Interval Bottom: 4760 ft.| Completed Information for Formation MUDDY J | | 1st Production Date: | 11/6/1992 | Choke Size: | | | Formation Name: | MUDDY J | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/1992 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 411.2 | | CALC_BBLS_OIL | 9.3 | | CASING_PRESS | 60 | | GRAVITY_OIL | 38 | | TUBING_PRESS | 60 |
| | Perforation Data: | | Interval Top: | 4720 ft. | # Of Holes: | 41 | | Interval Bottom: | 4760 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: SI - 1/1/2024 Interval Top: 4218 ft. Interval Bottom: 4241 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/1/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/16/2008 | | Treatment Summary: | Frac'd with 909 bbls 2% NaCL slickwater, 748 mcf of N2, 24 bbls 15% Acetic Acid and 141,000 lbs 16/30 Brady sand |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 4200 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/19/2011 | Test Method: | SWAB | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 224 | | CALC_BBLS_OIL | 224 | | CASING_PRESS | 30 | | GRAVITY_OIL | 30 |
| | Perforation Data: | | Interval Top: | 4218 ft. | # Of Holes: | 92 | | Interval Bottom: | 4241 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 12/31/2023 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|