|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 8/12/2017 Measured TD: 3524 ft. Vertical TD: 3247 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 8/12/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/2/2016 | | Proposed Top PZ Location: | Sec:17 Twp: 33N 8W | Footage: 1988 FNL 1643 FWL | | Bottom Hole Location: | Sec:17 Twp: 33N 8W | Footage: 2233 FNL 1813 FWL | | Proposed Depth/Form: | 3590 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-195 , Unit Acreage: 320, Drill Unit: W/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 500 ft., Depth: 3590 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 750, Top: 0 ft., Bottom: 3590 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/5/2014 | | Spud Date: | 5/27/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 3524 ft. | Measured PB depth: | 3474 ft. | | True Vertical TD: | 3247 ft. | True Vertical PB depth: | 3201 ft. | | Top PZ Location: | Sec:17 Twp: 33N 8W | Footage: 1988 FNL 1643 FWL | | Bottom Hole Location: | Sec:17 Twp: 33N 8W | Footage: 2233 FNL 1813 FWL | | Log Types: | Cased hole log, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 521 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 356, Top: 0 ft., Bottom: 521 ft., Determination Method: VISU | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 3515 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 750, Top: 0 ft., Bottom: 3515 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FRUITLAND COAL | 2842 ft. | 3166 ft. | N | N |
Formation FRLD Formation Classification: GW Status: CM - 10/1/2014 Interval Top: 2842 ft. Interval Bottom: 3166 ft.| Completed Information for Formation FRUITLAND | | 1st Production Date: | 10/28/2014 | Choke Size: | | | Formation Name: | FRUITLAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/16/2014 | Treatment End Date: | 9/16/2014 | | Treatment Summary: | See attached. | | Total fluid used in treatment (bbls): | 1041 | Max pressure during treatment (psi): | 3182 | | Total gas used in treatment (mcf): | 1663866 | Fluid density (lbs/gal): | | | Type Of gas: | NITROGEN | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | 55 | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 767 | | Fresh water used in treatment (bbls): | 986 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 136300 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 2830 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/31/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1 | | CALC_MCF_GAS | 410 | | CASING_PRESS | 818 | | MCF_GAS | 410 | | TUBING_PRESS | 818 |
| | Perforation Data: | | Interval Top: | 2842 ft. | # Of Holes: | 184 | | Interval Bottom: | 3166 ft. | Hole Size: | 0.46 in. |
|
Formation FRLDC Formation Classification: GW Status: PR - 8/12/2017 Interval Top: 2842 ft. Interval Bottom: 3166 ft.| Completed Information for Formation FRUITLAND COAL | | 1st Production Date: | 10/31/2014 | Choke Size: | | | Formation Name: | FRUITLAND COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/23/2017 | Treatment End Date: | 7/23/2017 | | Treatment Summary: | 2 Stage Frac: 1st stage fraced w/ 60800# sand and 893 bbl flui,d 2nd stage fraced w/ 129800 lbs sand and 1386 bbls fluid. | | Total fluid used in treatment (bbls): | 2279 | Max pressure during treatment (psi): | 4620 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 1.00 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 1.11 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 199 | | Fresh water used in treatment (bbls): | 2231 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 190600 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 3218 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/12/2017 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BTU_GAS | 924 | | CALC_BBLS_H2O | 8 | | CALC_MCF_GAS | 32 | | CASING_PRESS | 55 | | MCF_GAS | 32 | | TUBING_PRESS | 55 |
| | Perforation Data: | | Interval Top: | 2842 ft. | # Of Holes: | 204 | | Interval Bottom: | 3166 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 46609 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 22.023 |
| Average MCFE per Day | 127.748 |
| Federal Financial Assurance | i | |
|
|