|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/20/2008 Measured TD: 3365 ft. Vertical TD: 3194 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/20/2008 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20083450 | Expiration Date: | 7/6/2009 | | Proposed Top PZ Location: | Sec:12 Twp: 32N 7W | Footage: 786 FSL 870 FWL | | Bottom Hole Location: | Sec:12 Twp: 32N 7W | Footage: 786 FSL 870 FWL | | Proposed Depth/Form: | 3345 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-185 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 7/19/2008 | | Spud Date: | 7/12/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 3365 ft. | Measured PB depth: | 3318 ft. | | True Vertical TD: | 3194 ft. | True Vertical PB depth: | 3146 ft. | | Top PZ Location: | Sec:12 Twp: 32N 7W | Footage: 786 FSL 870 FWL | | Bottom Hole Location: | Sec:12 Twp: 32N 7W | Footage: 786 FSL 870 FWL | | Log Types: | TRIPLE COMBO, AIL, CN/TLD, GR/CCL/CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 419 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 420 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 3364 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 3365 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | OJO ALAMO | 1626 ft. | 1757 ft. | N | N | | KIRTLAND | 1757 ft. | 2655 ft. | N | N | | FRUITLAND | 2655 ft. | 3084 ft. | N | N | | FRUITLAND COAL | 3084 ft. | 3260 ft. | N | N | | PICTURED CLIFFS | 3260 ft. | 3365 ft. | N | N |
Formation FRLDC Formation Classification: GW Status: PR - 9/20/2008 Interval Top: 2916 ft. Interval Bottom: 3059 ft.| Completed Information for Formation FRUITLAND COAL | | 1st Production Date: | 9/19/2008 | Choke Size: | | | Formation Name: | FRUITLAND COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/27/2008 | | Treatment Summary: | ACIDIZE W/2000 GALS 15% HCL ACID. FRAC'D W/36,711 GALS 20# LINEAR GEL & 80,056 GALS 13 CP DELTA 140 CARRYING 124,311# 16/30 BASF & 52,005# 12/20 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 3253 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/20/2008 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 55 | | BBLS_OIL | 0 | | BTU_GAS | 993 | | CALC_BBLS_H2O | 55 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 141 | | CASING_PRESS | 199 | | GRAVITY_OIL | 1 | | MCF_GAS | 141 | | TUBING_PRESS | 3 |
| | Perforation Data: | | Interval Top: | 2916 ft. | # Of Holes: | 78 | | Interval Bottom: | 3059 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 47334 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 22.347 |
| Average MCFE per Day | 129.598 |
| Federal Financial Assurance | i | Y |
|
|