|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 7/1/2011 Measured TD: 3407 ft. Vertical TD: 3056 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 7/1/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20073694 | Expiration Date: | 8/23/2008 | | Proposed Top PZ Location: | Sec:6 Twp: 32N 6W | Footage: 720 FNL 706 FEL | | Bottom Hole Location: | Sec:6 Twp: 32N 6W | Footage: 720 FNL 706 FEL | | Proposed Depth/Form: | 3525 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-185 , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 10/12/2007 | | Spud Date: | 10/4/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 3407 ft. | Measured PB depth: | 3356 ft. | | True Vertical TD: | 3056 ft. | True Vertical PB depth: | 3005 ft. | | Top PZ Location: | Sec:6 Twp: 32N 6W | Footage: 720 FNL 706 FEL | | Bottom Hole Location: | Sec:6 Twp: 32N 6W | Footage: 720 FNL 706 FEL | | Log Types: | PE-TRIPLE COMBO, AIL/GR, TRIPLE LD/CN, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 370 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 219, Top: 0 ft., Bottom: 375 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 3403 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 3407 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | OJO ALAMO | 1776 ft. | 1967 ft. | N | N | | KIRTLAND | 1967 ft. | 2550 ft. | N | N | | FRUITLAND | 2550 ft. | 3085 ft. | N | N | | FRUITLAND COAL | 3085 ft. | 3122 ft. | N | N | | PICTURED CLIFFS | 3122 ft. | 3407 ft. | N | N |
Formation FRLDC Formation Classification: GW Status: PR - 8/1/2011 Interval Top: 2921 ft. Interval Bottom: 3096 ft.| Completed Information for Formation FRUITLAND COAL | | 1st Production Date: | 7/21/2008 | Choke Size: | | | Formation Name: | FRUITLAND COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/18/2008 | | Treatment Summary: | ACIDIZE W/1687 GALS 15% HCL. FRAC'D W/74,038 GALS 13 CP DELTA 140 HYBRID CARRYING 119,898# 16/30 BASF SAND & 54,800# 12/20 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 3303 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/21/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 87 | | BBLS_OIL | 0 | | BTU_GAS | 985 | | CALC_BBLS_H2O | 87 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 250 | | CASING_PRESS | 276 | | GRAVITY_OIL | 1 | | MCF_GAS | 250 | | TUBING_PRESS | 205 |
| | Perforation Data: | | Interval Top: | 2921 ft. | # Of Holes: | 81 | | Interval Bottom: | 3096 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 50301 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 23.695 |
| Average MCFE per Day | 137.457 |
| Federal Financial Assurance | i | Y |
|
|