Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-067-09387
Well Classification: CBM Status: PR - 7/1/2011
Well Name/No:FLAGG #6-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:HILCORP ENERGY COMPANY - 10133
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2011
FacilityID:292003LocationID:333412
County:LA PLATA #067Location:SWNE 6 32N6W N
Field:IGNACIO BLANCO - #38300Elevation:6370 ft.
Basin:SAN JUAN BASIN  
Planned Location:1532FNL  1373 FELLat/Long: 37.049060 / -107.537590Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.049060 / -107.537590Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/1/2011             Measured TD: 3407 ft.    Vertical TD: 3056 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/1/2011
Wellbore PermitDIRECTIONAL
Permit #:20073694 Expiration Date:8/23/2008
Proposed Top PZ Location:Sec:6 Twp: 32N 6W Footage: 720 FNL  706 FEL
Bottom Hole Location:Sec:6 Twp: 32N 6W Footage: 720 FNL  706 FEL
Proposed Depth/Form:3525 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-185 , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:10/12/2007
Spud Date:10/4/2007Spud Date Is:ACTUAL
Measured TD:3407 ft.Measured PB depth:3356 ft.
True Vertical TD:3056 ft.True Vertical PB depth:3005 ft.
Top PZ Location:Sec:6 Twp: 32N 6WFootage: 720 FNL  706 FEL
Bottom Hole Location:Sec:6 Twp: 32N 6WFootage: 720 FNL  706 FEL
Log Types:PE-TRIPLE COMBO, AIL/GR, TRIPLE LD/CN, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 370 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 219, Top: 0 ft., Bottom: 375 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 3403 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 3407 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
OJO ALAMO1776 ft.1967 ft.NN
KIRTLAND1967 ft.2550 ft.NN
FRUITLAND2550 ft.3085 ft.NN
FRUITLAND COAL3085 ft.3122 ft.NN
PICTURED CLIFFS3122 ft.3407 ft.NN

Formation FRLDC                   Formation Classification:  GW                   Status:  PR - 8/1/2011                  Interval Top: 2921 ft.    Interval Bottom: 3096 ft.

 Completed Information for Formation FRUITLAND COAL
1st Production Date:7/21/2008Choke Size: 
Formation Name:FRUITLAND COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/18/2008
Treatment Summary:ACIDIZE W/1687 GALS 15% HCL. FRAC'D W/74,038 GALS 13 CP DELTA 140 HYBRID CARRYING 119,898# 16/30 BASF SAND & 54,800# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:3303 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/2008Test Method:FLOWING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 87
BBLS_OIL 0
BTU_GAS 985
CALC_BBLS_H2O 87
CALC_BBLS_OIL 0
CALC_MCF_GAS 250
CASING_PRESS 276
GRAVITY_OIL 1
MCF_GAS 250
TUBING_PRESS 205
Perforation Data:
Interval Top:2921 ft.# Of Holes:81
Interval Bottom:3096 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)50301
GOR
GOR DeterminationMCFE
Average BOE per Day23.695
Average MCFE per Day137.457

 Federal Financial Assurance  i Y

 Tribal Well  i No