|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 7/1/2024 Measured TD: 5648 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 7/1/2024 | | Wellbore Permit | | | Permit #: | 20021275 | Expiration Date: | 7/10/2003 | | Proposed Depth/Form: | 5450 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-85 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: 112-1 , Unit Acreage: 320, Drill Unit: W/2 | | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: , Depth: 5450 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 2900 ft., Bottom: 5450 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 2900 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 222, Top: 0 ft., Bottom: 2900 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/6/2002 | | Spud Date: | 7/26/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 5648 ft. | Measured PB depth: | 5575 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: FL FL | | Bottom Hole Location: | Sec: Twp: | Footage: FL FL | | Log Types: | TRIPLE COMBO | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 427 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 589, Top: 0 ft., Bottom: 427 ft., Determination Method: | | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 3200 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 3200 ft., Determination Method: | | Casing: | String Type: 3RD, Hole Size: , Size: 4.5 in., Top: 3016 ft., Depth: 5648 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FRUITLAND | 2481 ft. | 2607 ft. | N | N | | FRUITLAND COAL | 2622 ft. | 2632 ft. | N | N | | MENEFEE | 4868 ft. | 5075 ft. | N | N | | POINT LOOKOUT | 5202 ft. | 5451 ft. | N | N |
Formation MVRD Formation Classification: GW Status: TA - 9/1/2023 Interval Top: 4868 ft. Interval Bottom: 5075 ft.| Completed Information for Formation MESAVERDE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MESAVERDE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/6/2002 | | Treatment Summary: | WAITING ON PIPELINE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation MVRD. |
| | Perforation Data: | | Interval Top: | 4868 ft. | # Of Holes: | 27 | | Interval Bottom: | 5075 ft. | Hole Size: | |
|
Formation FCMVD Formation Classification: GW Status: CM - 6/5/2002 Interval Top: 2481 ft. Interval Bottom: 2607 ft.| Completed Information for Formation FRUITLAND COAL-MESAVERDE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FRUITLAND COAL-MESAVERDE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/6/2002 | | Treatment Summary: | WAITING ON PIPLINE FOR TEST DATE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5230 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FCMVD. |
| | Perforation Data: | | Interval Top: | 2481 ft. | # Of Holes: | 132 | | Interval Bottom: | 2607 ft. | Hole Size: | |
|
Formation FRLDC Formation Classification: GW Status: PR - 12/1/2021 Interval Top: 2481 ft. Interval Bottom: 2607 ft.| Completed Information for Formation FRUITLAND COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FRUITLAND COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/6/2002 | | Treatment Summary: | WAITING ON PIPELINE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 2598 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FRLDC. |
| | Perforation Data: | | Interval Top: | 2481 ft. | # Of Holes: | 132 | | Interval Bottom: | 2607 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 35451 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 16.770 |
| Average MCFE per Day | 97.269 |
| Federal Financial Assurance | i | Y |
|
|