Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-067-08704
Well Classification: CBM Status: PR - 3/15/2002
Well Name/No:TINKER FEDERAL #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SIMCOE LLC - 10749
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C 17216
Facility Status:PRStatus Date3/15/2002
FacilityID:263013LocationID:306755
County:LA PLATA #067Location:SESW 12 34N8W N
Field:IGNACIO BLANCO - #38300Elevation:7100 ft.
Planned Location:811FSL  1442 FWLLat/Long: 37.224427 / -107.700624Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.224624 / -107.700664Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/7/2002             Measured TD: 2731 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/7/2002
Wellbore Permit
Permit #:20020340 Expiration Date:3/11/2003
Proposed Depth/Form:2600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-156 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:5/14/2002
Spud Date:4/3/2002Spud Date Is:ACTUAL
Measured TD:2731 ft.Measured PB depth:2668 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:     
Log Types:1.GR 2. AI 3. COMP/NEU/TRIP/LITHO-DENSITY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 460 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 460 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2731 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: , Top: 1900 ft., Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2731 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 1900 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
FRUITLAND COAL2179 ft.2434 ft.NN
PICTURED CLIFFS2434 ft.NN

Formation FRLD                     Formation Classification:  CBM                     Status:  CM - 5/15/2002                 Interval Top: 2228 ft.    Interval Bottom: 2254 ft.

 Completed Information for Formation FRUITLAND
1st Production Date:N/AChoke Size: 
Formation Name:FRUITLANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/14/2002
Treatment Summary:ACIDIZE FRUITLAND COALS W/600 GALS 15% HCL W/ ADDITIVES. FRACTURE STIMULATE FRUITLAND COALS DOWN 5 1/2 CSG W/ 61,466 GALS OF 23 DELTA FRAC FLUID AND SANDWEDGE CONTAINING 136,599# 12/20 OTTOWA SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2213 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/15/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 416
BBLS_OIL 0
CASING_PRESS 260
MCF_GAS 315
TUBING_PRESS 65
Perforation Data:
Interval Top:2228 ft.# Of Holes:104
Interval Bottom:2254 ft.Hole Size:

Formation FRLDC                   Formation Classification:  CBM                   Status:  PR - 2/7/2002                  Interval Top: 2228 ft.    Interval Bottom: 2384 ft.

 Completed Information for Formation FRUITLAND COAL
1st Production Date:N/AChoke Size: 
Formation Name:FRUITLAND COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/14/2002
Treatment Summary:ACIDIZE FRUITLAND COALS W/700 GALS 15% HCL 10 ADDITIVES. FRACTURE STIMULATE FRUITLAND COALS DOWN 5 1/2 CSB W/48,662 GALS 20 DELTA FRACFLUID AND SANDWEDGE CONTAINING 132,639# 12/20 OTTOWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 416
BBLS_OIL 0
CASING_PRESS 260
MCF_GAS 315
TUBING_PRESS 65
Perforation Data:
Interval Top:2228 ft.# Of Holes:160
Interval Bottom:2384 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)106609
GOR
GOR DeterminationMCFE
Average BOE per Day50.197
Average MCFE per Day291.169

 Federal Financial Assurance  i Y

 Tribal Well  i No